Campus lan and Wireless lan solution Design Guide



Download 2,16 Mb.
Pdf ko'rish
bet16/73
Sana13.07.2022
Hajmi2,16 Mb.
#791104
1   ...   12   13   14   15   16   17   18   19   ...   73
Bog'liq
cisco-campus-lan-wlan-design-guide

Oversubscription ratios 
For three-tiered designs, increasing the uplink speeds between the access and distribution layer switches may 
also require increasing uplink speeds between the distribution and core layer switches in order to maintain the 
desired oversubscription ratio.
Determining the oversubscription ratio of the uplink between the distribution and core layer switches is fairly 
straight forward. You need to take into consideration the number of ports connecting the distribution layer 
switches to the access layer switches or switch stacks, as well as the speeds at which the ports are operating. 


© 2020 Cisco and/or its affiliates. All rights reserved. 
Page 17 of 76
 
Oversubscription between the distribution and core layer switches – 40 Gbps uplinks 
Figure 11. 
For example, let’s say your distribution layer switch is a StackWise Virtual pair that supports a building with 4 
floors. Each floor has two IDFs (wiring closets). Each IDF has an access layer switch stack consisting of four 
48-port switches along with a 2 x 25 Gbps uplink module in two of the switches within the stack. The total 
number of 25 Gbps ports required at the distribution layer switches is 4 uplinks x 2 IDFs per floor x 4 floors = 32 
ports.
This configuration would provide up to 32 x 25 Gbps = 800 Gbps bandwidth between the distribution layer and 
access layer switches. Simply keeping existing 2 x 40 Gbps uplinks would only provide up to 80 Gbps between 
the distribution layer and core layer switches. This would provide an oversubscription ratio of 800:80 or 10:1 
between the distribution and core layers. Depending upon your business requirements, this may be insufficient. 
Increasing Uplink Speeds 
You could choose to add additional 40 Gbps links between the distribution and core layer switches, possibly 
operating in a Layer 3 EtherChannel configuration. However, this would require additional 40 Gbps switch ports 
at every distribution layer and core layer switch. More importantly, it would require additional fiber optic pairs 
between the distribution layer switches and the core layer switches.
In a large campus deployment, the core layer switches may be located in a centralized data center in a different 
building. If insufficient optical pairs exist, then additional optical cabling would need to be pulled between the 
centralized data center and each of the buildings. This could be a very expensive proposition, as existing 
conduit space between the buildings may not be capable of supporting additional cabling, and you run the risk 
of damaging the existing cabling in the conduit – resulting in an extended outage. Installing new conduit may 
involve getting the necessary right-of-way to trench and install underground conduit – on top of the cost to 
install the new fiber optic cable. 
An alternative may be to upgrade the uplink speeds between the distribution layer and core layer switches to 
100 Gbps. 


© 2020 Cisco and/or its affiliates. All rights reserved. 
Page 18 of 76

Download 2,16 Mb.

Do'stlaringiz bilan baham:
1   ...   12   13   14   15   16   17   18   19   ...   73




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish