Instructions for qualified and authorized operating personnel



Download 4,06 Mb.
Pdf ko'rish
bet9/16
Sana06.04.2022
Hajmi4,06 Mb.
#531660
TuriInstructions
1   ...   5   6   7   8   9   10   11   12   ...   16
Bog'liq
EN01 BA HY-VECTOR manual version operating instructions Rev01 2017-03-07

 ATTENTION! 
The use of hydraulic oils that do not meet the manufacturer's 
recommendation may cause damage to the unit. 
Warranty claims can become invalid. 

Only use hydraulic oil recommended by the manufacturer. 
The manufacturer-approved oils can be found starting on page 96. 


Commissioning the unit 
41 
To fill the hydraulic oil in the oil tank of the unit, proceed as follows: 

Make sure that the unit stands securely on a flat surface. 

Remove the bleed and ventilation valve (21) of the unit's filling opening. 

Slowly fill fresh hydraulic oil into the oil container until the oil fills the upper 
sight glass half up. 

Put the bleed and ventilation valve on the filler opening. 

Tighten the bleed and ventilation valve by hand. 


Commissioning the unit 
42 
Tool connection 
WARNING 
Risk to life when using tools or hydraulic hoses that do not 
comply with the tool and hose specifications. 
Unsuitable tools or hydraulic hoses can fail. 

Only use tools and hydraulic hoses which the manufacturer 
of the unit allows as an accessory. 

Observe and follow the operating instructions of the tools 
and the hose specification. 
Before you can connect a tool, you have to remove the protective cap and the 
protective plug of two stacked couplings. Proceed as follows: 

Screw the protective plug (A) counterclockwise from the corresponding 
connection (13). 

Screw the safety cap (B) counterclockwise from the corresponding 
connection (14). 
The protective cap and the protective plug are permanently connected to the 
corresponding coupling. 
You can now connect a tool. 
To connect a tool to the unit, proceed as follows: 

Ensure that the hydraulic hoses are not damaged. 

Plug the male connector (A) on the hydraulic hose of the tool on the female 
connection (13) of the unit. 


Commissioning the unit 
43 

Screw the connection with the union nut hand-tight. 

Plug the female connection (B) on the hydraulic hose of the tool on the male 
connection (14) of the unit. 

Screw the connection with the union nut hand-tight. 
Connect mains plug 

Download 4,06 Mb.

Do'stlaringiz bilan baham:
1   ...   5   6   7   8   9   10   11   12   ...   16




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish