A N N E x 2 , F I g u r E 1
Decision Tree for Testing and Investing
Source | Robert Bacon.
NO INVEST
TEST
NO TEST
60 - K
-20
0
NO INVEST
INVEST
DRy p=0.8
300 - k
- k
300
-100
0
DRy p=0.8
INVEST


127
Such a tree is shown in Annex 2, Figure 1. A square node indicates a decision (test or not), a circular 
node indicates a probabilistic outcome (wet well or dry well), and a triangular node indicates the 
net benefits of that particular outcome. The decision maker chooses the path through the tree that 
provides the maximum expected benefit.
The first path through the tree is one in which the test is undertaken. If a wet hole is found (assessed 
at probability 0.2) then investment would take place because of the certainty about the resource—the 
net benefit would be 300 - K (the net benefit of the project less the cost of the test). If a dry hole is 
found (probability 0.8) no investment would take place because of certainty that a viable resource 
is not present—the net benefit would be -K (the cost of the test). Taking the expected value of these 
outcomes (the weighted average) leads to a value of 60 - K. Provided the cost of the test is less than 
60, the outcome of testing and then investing or not, according to the test results, yields a positive 
expected return.
v
The second path through the tree involves first the decision not to test and subsequently the decision 
to invest. This has two possible outcomes—a wet hole (probability 0.2) with net benefit of 300 (no cost 
of testing) and a dry hole (probability of 0.8) with a net benefit of -100 (wasted investment costs). The 
expected net benefit (weighted average) would be -20. Drilling without testing first would, with the 
assumed probability of success, lose money on average. The difference from the case with testing is 
that investing when there will be a dry hole could have been avoided by following the indications of the 
test results.
The third path through the tree would be the decision not to test and not to invest. The expected net 
benefit would be zero—no costs but no geothermal plant. If testing is not done, it is better not to invest 
than to invest, since the third path has a better expected outcome than the second path. However, 
provided the cost of the test is less than 60, it is best to follow the first path—test, then invest or not 
according to the results.
This example makes it clear that the values of the prior probability of a viable resource being found 
and the cost of the test are crucial to the decision taken. Decisions that maximize the expected net 
economic benefit for different values of these parameters are shown in Annex 2, Table 1. Lower 
costs for a test make it more likely that it will be optimal to test before investing, while higher prior 
probabilities of well success make it less likely that a test will be needed before investing. A high test 
cost and a low probability of success leads to the decision to neither test nor invest.
The cost of the test is known from general geophysical experience, adjusted to local conditions. 
Drilling an exploration well is a clearly defined activity and the cost should be calculable within a 
narrow margin. However, making a prior assessment of the probability that a viable resource will be 
found is more difficult and depends, in large part, on whether any prior drilling has taken place in 
the area. Bickel, Smith and Meyer (2008) discuss some aspects of arriving at an assessment of this 
probability. Annex 2, Box 1 indicates that globally the probability of well success (proportion of wells 
drilled that have found viable resources) is substantial, and that the probability of a well success tends 
to increase with the number of wells already drilled in a field as drillers learn about the characteristics 
of the field from previous trials.
A n n e x 2
v
In practice it is likely that a program of several exploratory wells would be drilled, and that certainty would be equated with a given number 
(for example, at least two out of four) indicating the presence of a viable resource.


128
G e o t h e r m a l H a n d b o o k : P l a n n i n g a n d F i n a n c i n g P o w e r G e n e r a t i o n 

Download 5,56 Mb.

Do'stlaringiz bilan baham:
1   ...   166   167   168   169   170   171   172   173   ...   177




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish