INSTALLATION OF INTERLAYERS
There are four basic steps in the proper
installation of an overlay system with a
geosynthetic interlayer. Surface preparation is
followed by the application of the tack coat,
installation of the geosynthetic, and finally the
placement of the asphalt overlay.
Surface Preparation
Clean the roadway of dirt, water, oil and debris.
Smaller cracks should be sealed. Large cracks in
excess of 1/8 inch (3.2 mm) and potholes should
be filled. The surface on which a moisture
barrier interlayer is place must have a grade
which will drain water off the pavement.
Milling of severely cracked or rutted pavement
may be required, or a thin layer of asphalt called
a leveling course may be applied. Sections of
broken asphalt that move under traffic loading
should be removed down to the subgrade and
reconstructed.
Sweeping is an important part of surface preparation
Tack Coat Application and Fabric Laydown
Do'stlaringiz bilan baham: |