for each of the resources.
US$1,000), based on the scope of the activities and magnitude of the project.
and may include an amount for contingencies.
239
u
u
Organizational procedures links.
The work breakdown structure (WBS) (Section 5.4) provides the
framework for the cost management plan, allowing for consistency with the estimates, budgets, and control
of costs. The WBS component used for the project cost accounting is called the control account. Each
control account is assigned a unique code or account number(s) that links directly to the performing
organization’s accounting system.