Introduction to Industrial Automation


Figure 7.64  The PLC controls the fullness of the parking lot



Download 43,9 Mb.
Pdf ko'rish
bet335/440
Sana01.01.2022
Hajmi43,9 Mb.
#294756
1   ...   331   332   333   334   335   336   337   338   ...   440
Bog'liq
Introduction to Industrial Automation by Stamatios Manesis, George

Figure 7.64  The PLC controls the fullness of the parking lot.


334

 



  Introduction to Industrial Automation

  1. By instantaneous pressing of the “Stand-by ON” button, the automation system is powered

and the escalator is ready to operate if someone approaches it.

  2. The readiness and hence the operation capability is removed by pressing the “Stand-by OFF” 

button.


  3. For the “Stand-by ON” status, a corresponding light indicator is activated.

  4. If the electric ladder is operating due to human presence, it stops immediately if the STOP 

button on the control panel is pressed, if one of the two emergency buttons at the entrance 

and exit of the ladder is pressed, or if the thermal overload switch of the motor is activated.

  5. If the escalator is in “Stand-by ON” status and a person is approaching, the activation of the 

photocell will cause the ladder to operate for 40 s, after which it will automatically stop.

  6. Successive arrivals of people will cause a reset to the 40-s operating time.

  7. During the maintenance period, it is necessary to operate the ladder manually. This is accom-

plished with the “momentary operation” button, which means that the ladder operates as long 

as the button is pressed, regardless of whether the system is in “Stand-by ON” status or not.

The escalator operation, based on the above specifications, is accomplished with the classic 

automation circuit shown in Figure 7.66. Two auxiliary relays and an OFF-delay timer are used. 

Relay C is the power relay that powers the motor of the escalator. Figure 7.67 shows the con-

nections of the I/O devices in the PLC and the corresponding programs in both LAD and FBD 

languages. In Boolean language, the program will have the following instructions:

A(

O



I1.0

O

M3.0



)

AN M4.0


=

M3.0


=

Q0.4


A(

O

I1.2



O

I1.4


O

I2.0


O

I2.2


O

I2.4


)

A

M3.0



=

M4.0


A

I2.6


A

M3.0


L

‘40 sec’


SF

T1

A



T1

=

M5.0



O(

A

M5.0



A

M3.0


)

O

I1.6



=

Q0.1


BE

The three programs do not constitute a perfectly direct translation of the classic automation circuit. 

For example, the logic coil M5.0 does not exist as an auxiliary relay in the classic automation circuit.

M

Stand-by ON



Stand-by OFF

Stand-by


indication

Momentary

operation

STOP


Push button

for emergency

stop 

Photocell



Control panel

Push button for

emergency stop


Download 43,9 Mb.

Do'stlaringiz bilan baham:
1   ...   331   332   333   334   335   336   337   338   ...   440




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish