Located in the northern region, ghana birim goldfields ghana limited



Download 363 Kb.
bet5/5
Sana14.03.2017
Hajmi363 Kb.
#4399
1   2   3   4   5

3.4FINANCIAL REPORTING

3.4.1Exploration Expenditure Incurred To Date


Birim Goldfields Ghana Limited has expended in excess of US$ 1,485,678.66 on the Tinga Prospecting License since acquiring the property to date. The figures are not fully audited.


DESCRIPTION

AMOUNT USD







Airborne Geophysics




Interpretation

-

Data Acquisition

-

Ground Geophysics

19,182.48







Soil Geochemistry




Analysis

15,245.69

Labour

5,116.68







Stream Geochemistry




Analysis

15,245.69

Labour

5,116.68







Mapping and Rock Sampling




Analysis

15,245.69

Labour

5,116.68







Trenching




Analysis

15,245.69

Labour

5,116.68













Drilling




Drilling Cost

702,888.17

Analysis

15,245.69

Labour

5,116.68

Core Cutting

-

Core Storage

-

Mobilisation

-

Pad Preparation

-







Survey and Line Cutting




Contractors

6,181.05

Labour

-

GPS

499.51







Other Geological Expenses




Analysis - General

-

Farmer's Compensation

34.78

Community fees/Charges

0.55

Labour - General

-

Landsat

-

Maps and Databases

87.92

Plan Duplication

-

Roads and Access

605.34

Sample Preparation

826.35







Operational Field Supplies




Field Equipment Maintenance

1,972.54

General Field Supplies and Consumables

80,088.64

Other

-







Vehicles




Maintenance

21,317.99

Fuel and Lubricants

18,088.32

Other

-







Camp Running Expenses




Construction and Renovation

362.04

Office/ House Rent

30,341.61

Staff Food and Beverage

21,644.48

Office/ House Supplies and Consumables

14,505.62

Communications

10,996.93

Utilities and Services

6,684.43

Office/House Equipment Maintenance

8,476.49

Security Contractor

5,905.95

General Maintenance

788.92

Generator Fuel

2,060.32







Personnel




Consultants and Expatriate

125,916.89

National Personnel

164,261.36

Medical Expenses

5,160.96

Contractor - General

-







Travel and Transport




Accommodation

2,156.94

Business Airfares

4,266.92

Other

14,985.62







Licenses and permits




Recon & Prosp. License Fees

90.62

EPA permits

8.63

Search and registration

13.11







General Expenses




Audit and Legal fees

12,702.35

Miscellaneous Insurance

2,818.04

Bank Charges

6,304.22

Miscellaneous

-

Freight, Duties, Taxes etc

-







TOTAL

1,485,678.66

Table 4: Expenditure incurred on the Tinga Prospecting licence

3.5PROPOSED EXPLORATION WORK PROGRAMME

3.5.1Outline Of Proposed Future Exploration Program


Mapping on the Tinga licence should consist of litho-structural mapping of the existing Semafo trenches and the available outcrops. With the aim of further elucidating the structural deformation history in order to identify gold bearing structures and orientations.
It is recommended that some of the Semafo trenches are extended to the NW in order to confirm the presence of the shallow dipping mineralised thrust(?) intersected in the boreholes, during the second drill programme.
A further phase of scout reverse circulation drilling will be required in the future.

4.CONCLUSION AND RECOMMENDATIONS


Birim Goldfields intends to continue exploration on the Tinga Prospecting license. The systematic work and compilation of data undertaken by Birim will be followed up and targets will be pursued. Results from work completed have been encouraging and Birim is confident that additional careful systematic work could result in economic discoveries on the property.
Birim Goldfields requests that the Prospecting License be extended for an additional period to allow ongoing prospecting (Figure 7).
Birim Goldfields has expended approximately US$ 1,485,678.66 on the Tinga Prospecting License to date.
APPENDIX 1
DRILL HOLE BFE001 TO BFE063, AND BTI001 TO BTI018 COLLARS


APPENDIX 2
DRILL HOLE BFE001 TO BFE078, AND BTI001 TO BTI018 ASSAYS

APPENDIX 3
DRILL HOLE BFE001 TO BFE078, AND BTI001 TO BTI018 GEOLOGY

APPENDIX 4
STEREOGRAPHIC PLOTS FROM TINGA FAR EAST DRILL PROSPECT



  • PLOT OF POLES TO FOLIATION PLANES MEASURED IN DD CORE

  • PLOT OF POLES TO VEINS IN ALL DD HOLES

  • PLOT OF POLES TO INTERSECTION LINEATIONS IN DD CORE

  • PLOT OF POLES TO DYKES

  • PLOT OF POLES TO FRACTURE PLANES IN DD CORE

  • PLOT OF POLES TO FAULT PLANES IN DD CORE

  • PLOT OF POLES TO JOINT PLANES IN DD CORE

  • PLOT OF POLES TO LITHOLOGICAL CONTACTS

Download 363 Kb.

Do'stlaringiz bilan baham:
1   2   3   4   5




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish