PMU’s capacity
on EMP implementation during the construction stage - to 
enhance the PMU’s capacity regarding EMP implementation, the PMC’s 
International Environmental Specialist will provide respective training for PMU’s 
Safeguards Specialist and further assistance in monitoring SEMP implementation 
and guidelines for Contractor’s Environmental Specialists or designated officers as 
required.
ii) 
SCEEP capacity
on conduction of environmental monitoring of disposal sites. The 
PMC will work on a revision of the existing environmental monitoring system in the 
country and develop program with recommendation of parameters of overall 
environmental performance during the project operation. The PMC, jointly with the 
ESS Specialist, will develop and conduct a training program on general compliance 
with national environmental requirements such timely receiving timely permissions, 
monitoring of environmental performance, and submission of reports to respective 
national agencies.
iii) 
awareness program for population
in the project area - for project sustainability 
it is important to increase people’s awareness about waste management. The 
program should be targeted on two groups: (i) households, daily consumers, and
(ii) the younger generation (pupils, colleges’ students). The program should be
127


developed by a Regulatory Frameworks Development Specialist, and implemented 
along with the project implementation period.
396. 
The tentative plan of required training is presented in Table 40.
Table 40: T en tative program o f tra in in g fo r PMU, Toza H udud and C o n tra c to rs s ta ff
Name of training
Time
Recipients
Organizer
1
Overall EMP implementation, 
Environmental Monitoring 
Reports preparation
Prior to
commencement of 
civil works
PMU Safeguards 
Specialist
PMC
2
SEMP implementation
Prior
commencement of 
civil works
Contractors
workers
Contractor’s 
Environmental 
Specialist or 
designated 
officer with 
support of PMC
3
Handling and disposal of 
hazardous materials (including 
asbestos wastes for relevant 
sites)
Before starting 
respective works
Contractors 
workers, PMU. 
ESS Specialist
PMC
4
Occupational health and safety
Regularly during 
construction and 
operation period
Contractors
workers
Toza Hudud staff
Contractor’s 
Environmental 
Specialist or 
designated 
officer with 
support of PMC, 
Toza Hudud, 
OHS specialist
5
Working with equipment of 
mobile laboratory
Regularly during 
operation phase
Staff of 
laboratories
Initial training will 
be conducted by 
PMC’s IES and 
further by trained 
staff of SCEEP 
for provincial 
laboratories
8.4.3 C o st e s tim a tio n fo r EMP im p le m e n ta tio n
397. 
Costs required to implement the EMP cover the following activities:
(i) Conduct instrumental environmental monitoring of air by PMC;
(ii) Implement mitigation measures; and
(iii) Develop an awareness program including the organizing of an education center.
398. 
Although some of the measures included in the EMP are an integral part of the civil 
works (watering, storage of top soil and etc.), some measures (establishing sound-absorbing 
panels, temporary bridges, handling and disposal of hazardous materials) require additional 
funds. The cost estimate for the EMP by the main items is presented in Table 41.

Download 3,95 Mb.

Do'stlaringiz bilan baham:
1   ...   82   83   84   85   86   87   88   89   ...   93




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish