Islom karimov nomidagi



Download 4,13 Mb.
bet90/119
Sana01.01.2022
Hajmi4,13 Mb.
#284903
1   ...   86   87   88   89   90   91   92   93   ...   119
Bog'liq
MetodposobBPpechat

Suggested criteria


Assessment risk index



Suggested criteria


Intolerable region






Unacceptable under the existing circumstances


Tolerable region





Acceptable based on risk mitigation. It may require management decision.



Acceptable

region











Acceptable


Figure 5-5. Safety risk tolerability matrix

    1. FIFTH FUNDAMENTAL — SAFETY RISK CONTROL/MITIGATION




      1. In the fourth and final step of the process of bringing the safety risks of the consequences of an unsafe event or condition under organizational control, control/mitigation strategies must be deployed. Generally speaking, control and mitigation are terms that can be used interchangeably. Both are meant to designate measures to address the hazard and bring under organizational control the safety risk probability and severity of the consequences of the hazard.

      2. Continuing with the example presented in 5.6, the safety risk of the consequences of the hazard under analysis has been assessed as 4B (“unacceptable under the existing circumstances”). Resources must then be allocated to slide it down the triangle, into the tolerable region, where safety risks are ALARP. If this cannot be achieved, then the operation aimed at the delivery of services which exposes the organization to the consequences of the hazards in question must be cancelled. Figure 5-6 presents the process of safety risk management in graphic format.

      3. There are three generic strategies for safety risk control/mitigation:

        1. Avoidance. The operation or activity is cancelled because safety risks exceed the benefits of continuing the operation or activity. Examples of avoidance strategies include:

          1. operations into an aerodrome surrounded by complex geography and without the necessary aids are cancelled;

          2. operations in RVSM airspace by non-RVSM equipped aircraft are cancelled.

        2. Reduction. The frequency of the operation or activity is reduced, or action is taken to reduce the magnitude of the consequences of the accepted risks. Examples of reduction strategies include:

          1. operations into an aerodrome surrounded by complex geography and without the necessary aids are limited to daytime, visual conditions;

          2. operations by non-RVSM equipped aircraft are conducted above or below RVSM airspace.




            1. Figure 5-6. The process of safety risk management




        1. Download 4,13 Mb.

          Do'stlaringiz bilan baham:
1   ...   86   87   88   89   90   91   92   93   ...   119




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish