3.2.3   Machine Operation with Starting Delay

The most common cases of starting a machine take place directly after the application of the 

START signal in the automation circuit. This START signal can be provided in the automation 

circuit by a human, either through the pressing of a button or with the activation of a switch. 

Moreover, this command can be provided based on a sensing device, through the closing of an 

NO contact, when the sensing requirements are being met. However, there are specific cases where 

it is ideal that the machine starts after the elapse of a specific time delay T, from the time instant 

of applying the START command. At this point it should be mentioned that the logical question: 

“Instead of using the overall operation mentioned, the reason why someone cannot apply the com-

mand and signal START after the same time delay (T)” is justifiable but not correct. To clearly 

understand the importance of starting a machine with a time delay after the provided starting 

command, the following two examples will be presented.



Example 1: A specific category of pumps, called “hydro-lubricated”, need to be filled with 

water through a supporting tank before starting. The water filling of the tank can be completed 

in a short time interval of 1–4 minutes. In the case that an automatic operation of the pump is 

needed, the following procedure should be followed:

  1. In the beginning, the pump water filling mechanism should be set in operation, without the 

pump needing to be in operation. Let’s define “T” as the required time interval for complet-

ing this process.

  2. After the elapse of time T, the pump should be set in operation.

  3. In parallel with (2), the operation of the water filling mechanism is terminated.

An alternative implementation of this operation can also be assumed, where in the beginning a 

command can be provided to start the water filling mechanism and afterwards, when we identify 

that the pump is full of water and ready to start, to give the second command for starting the 

pump and terminating the water filling process. In this implementation, it should be noted that 

there is no automatic operation of the pump but a fully manual one.



Example 2: Let’s consider a parts processing station. The parts are being transported to the 

station through a conveyor belt. During the part processing, a proper initialization of the station 

(before) and the conveyor belt (after) can start. The initialization of the station could include the 

heating of specific area, the reception of complementary parts, and specific initialization tasks that 

are required to prepare the station for accepting the upcoming parts. This preliminary process of 

station preparation lasts a time interval T. It is more than straightforward that the start of the con-

veyor belt should be made automatic and, of course, after the elapse of the T time interval, from 

the moment that the station has been put in operation.




Industrial Automation Synthesis 



 



85

In both these examples, the problem of starting a machine with a time delay, after the start of 

the operation command, is evident. In these cases, where the time is included in the automation 

as a parameter of the physical process for implementing the automation circuit, the utilization of 

timers (time relays) is needed. A simple automation circuit that achieves the starting of a machine 

with a time delay is presented in Figure 3.5. In this case, the timer T is an electronic type time 

relay, which can be set at the desired delay time T, while the relay C corresponds to the machine 

that we would like to control. For a better understanding of the overall automation circuit and the 

utilization of the time relay, the time response of the automation circuit components (TC) is also 

presented in Figure 3.5.

The characteristics of the presented automation circuit are the ability to offer a permanent 

operation of the machine with a time delay in starting; a permanent stop through the switch RS; 

the ability of repeating the operational sequence as many times as desired; the re-operation; and 

the permanent supply of voltage to the time relay during the whole operation. The last character-

istic is of paramount importance, especially if it is considered that the time relay is an electronic 

device that should not be under voltage, in case that it is not utilized. Moreover, the time relay 

after the elapse of time T is no longer utilized in the automation circuit and thus it is desirable 

to have a redesigned automation circuit where, after the elapse of time T, the time relay will no 

longer be under voltage. Such a circuit is presented in Figure 3.6, where the time response of the 

voltage V

T

 at the terminals of the timer is also presented for a better understanding of the overall 



50 Hz 230 V

R

N



RS

T

C



T

T

OFF



ON

RS

C



OPEN

CLOSED


t

t

Circuit features:



•Permanent operation or stop of machine C

•Reoperation

•Timer continuously under voltage during operation 

 

 




Download 43,9 Mb.

Do'stlaringiz bilan baham:
1   ...   104   105   106   107   108   109   110   111   ...   440




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish