Introduction to Fire Safety Management


Applying additional risk control measures



Download 8,94 Mb.
Pdf ko'rish
bet146/596
Sana28.02.2022
Hajmi8,94 Mb.
#475054
1   ...   142   143   144   145   146   147   148   149   ...   596
Bog'liq
Fire-safety-managment

5.5.5 Applying additional risk control measures
Having analysed the risks taking into account any existing 
control measures, the next stage in the risk assessment 
process is to consider the effectiveness of the controls 
and additional control measures that will be required to 
reduce the risk as low as is reasonably practicable.
A wide range of risk control measures are available, 
many of which can be identifi ed through reading HM 
Government, HSE and industry guidance documentation, 
or seeking advice from specialist advisers and companies.
In assessing the suitability of controls not only 
must guidance be sought, but reference to the MHSW 
Regulations and RRFSO hierarchy of controls should be 
considered. These are detailed below:
1. Avoiding 
risks
2. Evaluating the risks which cannot be avoided
3. Combating the risks at source
4. Adapting to technical progress
5. Adapting the work to the individual, especially as 
regards the design of workplace, the choice of work 
equipment and the choice of working and produc-
tion methods, with a view, in particular, to alleviating 
monotonous work and work at a predetermined 
work rate and to reducing their effect on health
6. Replacing the dangerous by the non-dangerous or 
less dangerous
7. Developing a coherent overall prevention policy 
which covers technology, organisation of work and 
the infl uence of factors relating to the working 
envir onment
8. Giving collective protective measures priority over 
individual protective measures and
9. Giving appropriate instructions to employees.
The above principles of control are used in the MHSW 
Regulations. The same principles are used in the RRFSO 
and the Fire (Scotland) Act, which omits point 5 and 
slightly rewords the paragraphs to focus upon fi re.
Chapter 6 will detail in more depth with the range of 
risk control measures available in a practical approach, 
which while not exactly mirroring the above serves to 
provide the basis from which to consider the manage-
ment of any residual risks.
To ensure that a risk assessment can be 
demonstrated as being ‘suitable and suffi cient’, one of 
the key factors to be considered is that of prioritisation of 

Download 8,94 Mb.

Do'stlaringiz bilan baham:
1   ...   142   143   144   145   146   147   148   149   ...   596




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish