GmbH can be commissioned to carry out the commissioning. In principle
IGEMA GmbH recommends commissioning the indicator at the same time
as the boiler (item 8.2). If it is not possible to commission the indicator
according to item 8.2, the indicator can be commissioned with the boiler under pressure
and temperature (item 8.3)
All liquid level gauges are subjected to 100% pressure testing before delivery. In individual
cases, material settling may occur during transport, longer storage or during assembly. All
screw connections must therefore be checked for tight fit and appropriate torque (see following
text).
8.1 Before commissioning
Before commissioning, the indicator must be checked for damage and all screw connections
must be checked for tightening torque
Md
max
according to the table (see item 9.5)!
The union nuts of the valves must be tightened so that no leakage occurs at the spindle and
the handwheel / hand lever can still be turned.
Note!
After commissioning, slight leaks can occur in the valves, but these will reappear
after a short time due to temperature and pressure.
Danger
Info
19
8.2 Commissioning of the indicator at the same time as the boiler
First make sure that the drain valve (4) is closed. Then open the shut-off
valves (2, 3) to the stop. The boiler can now be commissioned with the
indicator. After commissioning the indicator must be checked for function
and leakage. The specified torques and the described tightening
sequence (item 9.5) apply.
8.3 Commissioning of the indicator, when the boiler is under pressure