Geothermal handbook: PlanninG and Financing power Generation t e c h n I c a L r e p o r t 2 / 2



Download 5,56 Mb.
Pdf ko'rish
bet149/177
Sana08.02.2022
Hajmi5,56 Mb.
#435170
1   ...   145   146   147   148   149   150   151   152   ...   177
Bog'liq
FINAL Geothermal Handbook TR002-12 Reduced

T A B L E 3 . 2
Case without Public Support
PARAMETER
VALUE 
Total Investment Cost of Project
US$ 196,000,000 
Investment Cost per Megawatt
US$ 3,920,000 / MW 
Required Return on Equity
25%
Interest Rate of the Loan
6%
Equity Share in Capex (from year 2 on)
30%
Tax Rate
20%
Capacity Factor
90%
O&M, including Labor 
US$ 10,192,000 / yr
Levelized Cost of Energy 
US$ 0.05 / kWh
Tariff 
US$ 0.12 / kWh
Return on Equity
24.5%
NPV
US$ -740,354
105
C h a p t e r 3
54
It is also assumed that no interest or principal is due until the project starts to generate revenues.
Example
The government is interested in adding a new (greenfield) 50 MW base-load geothermal plant to the 
grid and is trying to encourage private investment in the project. It starts by considering the case in 
which no upfront grant support is provided to the private investor, but the guaranteed off-take tariff is 
set at a level sufficient to meet the private investor’s required rate of return on equity. 
base case | 
No grants (or capital subsidy) support is provided by the government. Without assured 
support from the government or international donors in the early stages of a geothermal project, a 
private equity investor may perceive the risk to be high and require an accordingly high return on 
equity. The example considered here assumes the required rate of return on equity to be 25 percent 
(Table 3.2). However, this level of return on equity proves difficult to achieve. When all costs required 
to confirm the resource are included, the capital cost incurred throughout the first six years are about 
US$ 3.9 million per MW; and the plant commissioning and the first revenues are expected only in Year 
6. As a result, the net present value (NPV) of the Base Case comes out negative, even with a wholesale 
tariff as high as US$ 0.12 per kWh and a bank loan at 6 percent secured for 25 years.
54 
Given the negative NPV in the Base Case, the government considers a different approach.
Source | Authors.


106
G e o t h e r m a l H a n d b o o k : P l a n n i n g a n d F i n a n c i n g P o w e r G e n e r a t i o n 
106

Download 5,56 Mb.

Do'stlaringiz bilan baham:
1   ...   145   146   147   148   149   150   151   152   ...   177




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish