road edges into deepened edge drains. These
GEOSYNTHETICS IN SUBSURFACE DRAINAGE: 27
Subgrade Dewatering, Road Base Drainage, and Structure Drainage
For more information please contact the Geosynthetic Materials Association at www.gmanow.com.
Retrofit
Excavations for retrofit edge drains should be
done in such a way so as to prevent large voids
from occurring in the sides and bottom of the
trench. The edge drain can be an aggregate
trench drain with a collector pipe in the bottom.
The trench is “lined” with the filtration geotextile prior to
pipe and aggregate placement.
Do'stlaringiz bilan baham: