Deployment of the Geosynthetic
Unroll the geosynthetic on the prepared
subgrade in the direction of construction traffic.
Hold the geosynthetic in place with pins,
staples, fill material or rocks. Adjacent rolls
should overlap in the direction of the
construction. Depending on the strength of the
subgrade, the overlaps may have to be sewn.
Overlap Specifications
Soil Strength
(CBR)
Overlap
Unsewn
in (cm)
Overlap Sewn
in (cm)
Less than 1
-
9 (23)
1 – 2
38 (97)
8 (20)
2 – 3
30 (76)
3 (8)
3 & Above
24 (60)
-
Water sensitive subgrades can often be graded when dry
When more challenging subgrades are encountered it is
often more effective to leave vegetation and construction
debris in place. The geosynthetic will prevent migration
of fill soils into the voids within the debris.
Do'stlaringiz bilan baham: |