Design First Walters fm qxd 2/26/04 7: 50 pm page I


The Interstate and ‘Hospital



Download 7,56 Mb.
Pdf ko'rish
bet162/248
Sana07.01.2023
Hajmi7,56 Mb.
#898173
1   ...   158   159   160   161   162   163   164   165   ...   248
Bog'liq
Design First

The Interstate and ‘Hospital 
West’
(see Plate 36)
Part of the traffic study that preceeded the charrette
proposed the innovative idea of converting the
CHAPTER NINE

THE TOWN
195
Figure 9.3
The new Lowes Corporate Headquarters
under construction, 2003, Calloway Johnson Moore
and West, architects. This refreshingly contemporary
design is free from the needless neoclassical
ornamentation so beloved by other North Carolina
architects.
Walters_09.qxd 3/1/04 5:37 PM Page 195


existing confused traffic pattern around Exit 33 into
a double-roundabout interchange that provided a
short-term solution to the burgeoning issue of
east–west movement across the freeway to expanding
residential areas around the adjacent Lake Norman to
the west. We believed that the ultimate remedy for
this interchange must be a complete redesign into an
‘urban diamond;’ this would be especially appropri-
ate with increased traffic after the completion of the
new corporate headquarters.
Of particular importance from the earlier traffic
study was the proposal to construct a new bridge over
the interstate on the line of an extended Fairview
Road, the main east–west street which we upgraded to
a boulevard in our plan. East–west movements were
already very difficult in this area, and we endorsed a
simple bridge crossing (without access ramps to the
freeway) that would extend the Hospital District over
the interstate and open up another premium office
site immediately to the west of the freeway with access
to the hospital and Exit 33 immediately the north.
This was the site we had originally envisaged for a
corporate headquarters. It falls within a stringent
environmental protection zone, but a water detention
system that was properly disguised as a lake would
add an attractive landscape feature, just like the one
constructed as part of the Lowes master plan.
The area around the west side of the freeway exit
featured a mixture of low-intensity uses, and we laid
this segment out for small offices or light manufac-
turing on an improved grid of streets, with a small
additional amount of retail to complement an exist-
ing grocery store in that location. This did not
change in our master plan revision.

Download 7,56 Mb.

Do'stlaringiz bilan baham:
1   ...   158   159   160   161   162   163   164   165   ...   248




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish