Design First Walters fm qxd 2/26/04 7: 50 pm page I


The City Case Study 2: City of Raleigh, NC, Arena Small Area Plan Figure 8.1



Download 7,56 Mb.
Pdf ko'rish
bet144/248
Sana07.01.2023
Hajmi7,56 Mb.
#898173
1   ...   140   141   142   143   144   145   146   147   ...   248
Bog'liq
Design First

The City
Case Study 2: City of Raleigh, NC,
Arena Small Area Plan
Figure 8.1
West Raleigh Location Map. The
east–west dimension of the master plan area is a
little over three miles, and the north–south distance
just over a mile on average.
Walters_08.qxd 2/26/04 7:30 PM Page 175


through this area between downtown Raleigh and the
Research Triangle. As a result, the infrastructure is
heavily dependent upon a few connecting highways to
serve both regional and local traffic. There is not a very
good network of local streets, and the planned exten-
sion of a north–south highway across the site linking
populous areas to the south with a shopping mall to the
north will increase regional traffic around and through
the site. Planned street improvements and extensions
along the southern boundary will help to relieve the
stress on that east–west corridor and create a new
southern edge for the study area.
The main objective of the Small Area Plan was to
provide a coherent framework for development that
achieved three things:
1. Resolved the dichotomies of large-scale and small-
scale uses;
2. Avoided the kind of uncoordinated piecemeal
development of the type that had taken place to
date; and
3. Established a balance between development and
environmental protection.
A parallel requirement was to prepare a set of urban
design guidelines that would orchestrate development
in the future mixed-use centers proposed in the plan,
and that would be extended to cover all such village
and neighborhood centers within the city of Raleigh.
KEY ISSUES AND GOALS
Within this overarching objective, we established four
main issues to be examined by the plan. These were:
1. Achieving a balance between development and
environmental protection;
2. Improving the transportation infrastructure
through the site and capitalizing on the proposed
new commuter rail service;
3. Creating new types of transit-oriented develop-
ment (TOD) around the rail stations that illus-
trated principles of good urban design and
development economics;
4. Resolving the difficult relationships of scale
between the major state and civic operations and
adjacent new and existing neighborhoods.

Download 7,56 Mb.

Do'stlaringiz bilan baham:
1   ...   140   141   142   143   144   145   146   147   ...   248




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish