Design First Walters fm qxd 2/26/04 7: 50 pm page I


Recommendations and Implementation tasks



Download 7,56 Mb.
Pdf ko'rish
bet139/248
Sana07.01.2023
Hajmi7,56 Mb.
#898173
1   ...   135   136   137   138   139   140   141   142   ...   248
Bog'liq
Design First

Recommendations and Implementation tasks
Priority
Responsible party
R11
Investigate the feasibility of a demand response/point-deviation
Medium
TTA, RTP
transit system for the RTP and surrounding employment areas
Develop a plan for providing CORE area-wide transit services
that connects the RTP, TTA commuter rail system, and the Airport
using a system of high frequency circulator buses
R12
Evaluate terminating the Durham Freeway at I-540 and
High
CAMPO, DCHC 
providing any access road from Davis Drive
MPO, NC DOT,
Morrisville
Work with NCDOT, the MPOs, and RTP to explore this 
alternative for the extension of the Durham Freeway
R13
Extend Airport Boulevard to Davis Drive
Medium
CAMPO, DCHC 
MPO, NC DOT,
Cary, Morrisville
Develop and adopt an alignment and cross-section for the
extension of Airport Blvd to Davis Drive with a grade 
separation at the TTA corridor
R14
Extend McCrimmon Parkway across the rail line toward 
Medium
CAMPO, DCHC 
the Airport
MPO, NC DOT,
Cary, Morrisville
Develop and adopt an alignment and cross-section consistent
with a neighborhood center
R15
Extend Evans Road parallel to NC 54 and reconnect to 
Medium
CAMPO, DCHC
NC 54 beyond I-540
MPO, NC DOT,
Develop and adopt an alignment and cross-section for the
Cary, Morrisville
extension of Evans Rood to NC 54
R17
Complete the collector street plan for the CORE area
High
CAMPO, DCHC 
MPO, NC DOT,
Durham, Raleigh, 
Cary, Morrisville,
Develop and adopt a collector street plan for the portion of the
TJCOG
CORE south of I-540 and adopt the collector street plan
previously proposed for the area north of I-540
R29
Study the feasibility of creating an intermodal transit station and
Medium
Morrisville,
Neighborhood Center in the north Morrisville/Shiloh area
CAMPO, TTA
Develop a schematic development plan for this area that includes
detailed street, block, open space, and building type patterns for
adoption as an amendment to the Town’s Comprehensive Plan
.
Complete the Preliminary Engineering for the traffic operations
and transportation improvements necessary in this area
Table 7.1
Implementation Matrix (Extract). Master plans are incomplete without clear implementation strategies
that identify project content, priority and responsible parties.
Walters_07.qxd 2/26/04 7:29 PM Page 169


The other main component of the implementation
strategies comprised a detailed document setting out
General Development Guidelines to be used by all
Download 7,56 Mb.

Do'stlaringiz bilan baham:
1   ...   135   136   137   138   139   140   141   142   ...   248




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish