Recommendations and Implementation tasks
Priority
Responsible party
R11
Investigate the feasibility of a demand response/point-deviation
Medium
TTA, RTP
transit system for the RTP and surrounding employment areas
Develop a plan for providing CORE area-wide transit services
that connects the RTP, TTA commuter rail system, and the Airport
using a system of high frequency circulator buses
R12
Evaluate terminating the Durham Freeway at I-540 and
High
CAMPO, DCHC
providing any access road from Davis Drive
MPO, NC DOT,
Morrisville
Work with NCDOT, the MPOs, and RTP to explore this
alternative for the extension of the Durham Freeway
R13
Extend Airport Boulevard to Davis Drive
Medium
CAMPO, DCHC
MPO, NC DOT,
Cary, Morrisville
Develop and adopt an alignment and cross-section for the
extension of Airport Blvd to Davis Drive with a grade
separation at the TTA corridor
R14
Extend McCrimmon Parkway across the rail line toward
Medium
CAMPO, DCHC
the Airport
MPO, NC DOT,
Cary, Morrisville
Develop and adopt an alignment and cross-section consistent
with a neighborhood center
R15
Extend Evans Road parallel to NC 54 and reconnect to
Medium
CAMPO, DCHC
NC 54 beyond I-540
MPO, NC DOT,
Develop and adopt an alignment and cross-section for the
Cary, Morrisville
extension of Evans Rood to NC 54
R17
Complete the collector street plan for the CORE area
High
CAMPO, DCHC
MPO, NC DOT,
Durham, Raleigh,
Cary, Morrisville,
Develop and adopt a collector street plan for the portion of the
TJCOG
CORE south of I-540 and adopt the collector street plan
previously proposed for the area north of I-540
R29
Study the feasibility of creating an intermodal transit station and
Medium
Morrisville,
Neighborhood Center in the north Morrisville/Shiloh area
CAMPO, TTA
Develop a schematic development plan for this area that includes
detailed street, block, open space, and building type patterns for
adoption as an amendment to the Town’s Comprehensive Plan
.
Complete the Preliminary Engineering for the traffic operations
and transportation improvements necessary in this area
Table 7.1
Implementation Matrix (Extract). Master plans are incomplete without clear implementation strategies
that identify project content, priority and responsible parties.
Walters_07.qxd 2/26/04 7:29 PM Page 169
The other main component of the implementation
strategies comprised a detailed document setting out
General Development Guidelines to be used by all
Do'stlaringiz bilan baham: |