Extension time decision module
Extension time decision module (ETDM),calculate green light
time i.e., extension time of the phase which has higher urgency can be
calculated according to the number of vehicles as shown in Figure 4
.
There are two input variables namely
Queue-Lane-1, Queue-Lane-2
and
one output variable
Extension-Time
. The input variable
Queue-Lane-
1
count the number of vehicles of lane 1 and input variable
Queue-Lane-
2
count number of vehicles of other side i.e., lane 2 of red light phase
which has big traffic urgency. The output variable
Extension-Time
is
the extension time of current green light phase. Therefore for instance
in the case of Phase 1, ETDM will determine the green light duration
i.e., extension time (E1) by processing the queue length of the Lane
EL1 of the Road direction E and Lane WL1 of the Road direction W.
Similarly, for phase 2, ETDM will determine the extension time (E2)
by processing the queue length of the Lane EL2 of the Road direction E
and Lane WL2 of the Road direction W and so on.
Do'stlaringiz bilan baham: |