Commonwealth of pennsylvania department of conservation and natural resources bureau of recreation and conservation



Download 0,66 Mb.
Sana25.06.2017
Hajmi0,66 Mb.
#15372



DCNR-2017-Plan

Plan-GPM – 10 Rev. 12-12


COMMONWEALTH OF PENNSYLVANIA

DEPARTMENT OF CONSERVATION AND NATURAL RESOURCES

BUREAU OF RECREATION AND CONSERVATION


COMMUNITY CONSERVATION PARTNERSHIP PROGRAM

MUNICIPAL GREENWAYS



AND OPEN SPACE NETWORK PLANS





General Information and Scope of Work Guidelines




INSTRUCTIONS: The following general information and examples of specific work tasks are provided to assist in the development of a scope of work for Greenways and Open Space Network Plans. Please use this information to first determine if your proposed study is best conducted under this plan project type. A menu of scope options is provided. We encourage you to develop your proposed scope, tailored to meet the planning needs of your project, and submit this with your grant application. If your project is selected for funding, a detailed project scope must be submitted and approved by the Bureau before proceeding with the project.



I. GENERAL INFORMATION





  1. Before submitting a grant application and developing your scope of work, please contact the Bureau's Regional Advisor for your area of the Commonwealth to discuss your project and to develop a scope of work that meets your needs and the Bureau’s requirements. (A directory of Regional Advisors can be found in the Application Manual or by visiting the DCNR website at: www.dcnr.state.pa.us).




  1. Identifying the Appropriate Greenway Planning Project:

According to “Pennsylvania’s Greenways: An Action Plan for Creating Connections,” (Action Plan) greenways are linear corridors of public and private land that serve as the linkages between specifically identified natural resource-based or manmade features. They can be either land or water based and serve a variety of functions and benefits including recreation, transportation, community revitalization, economic development, natural resource conservation, environmental protection, wildlife habitat and migration and education. These corridors often follow old railways, canals, ridge tops, rivers and stream valleys.
The Community Conservation Partnerships Program offers four planning project types (each with sample scopes) under which greenway projects could be studied: Greenways and Open Space Network Plans, Greenway Plans, Rails-to-Trails Plans, and Rivers Conservation Plans. Here is basic guidance on how to determine which project type will best meet your needs:


  1. Greenways and Open Space Network Plan: The scope below was developed for county planning. It was tailored to multi-municipal and municipal greenways and open space network planning. The Bureau encourages such planning after a county has initiated its own planning effort, established county policy and a countywide greenway network. Such planning involves identifying natural and manmade resources and a network of greenways that will connect these important resources. The Bureau also recommends taking a multi-municipal approach to greenway planning.




  1. Greenway Plan: This type of planning targets a specific linear corridor of open space that may have been identified in a greenways and open space network plan discussed above or other local/regional planning effort. This scope is best used for a greenway along a river/stream, ridge tops, canals, road, and utility corridor, etc. There can be a broad study purpose addressing both recreational use trails and resource protection or a narrower focus on one or the other.




  1. Rails-to-Trails Plan: If most (75%) of your proposed greenway is on or adjacent to an abandoned railroad right-of-way and you want to study converting it to a trail, refer to the Rails-to-Trails Plan scope.




  1. Rivers Conservation Plan: If your project involves a significant water resource (watershed, river or large creek) and you are most interested in restoring, maintaining or enhancing this water resource, refer to the Rivers Conservation Plan scope.


C. Expectations of the Bureau

The Bureau has several priorities and expectations for greenways and open space network plans. The purpose of your plan should be developed to ensure that these expectations are met. We expect the following:




  1. A key recommendation of the Action Plan is for each county to adopt a county greenway plan by 2007. A pre-requisite for DCNR funded county greenway plans is completion of a County Natural Areas Inventory (CNAI). The Bureau is working with interested counties on either completing their CNAI or initiating greenway planning.




  1. Municipal and multi-municipal planning efforts should be generally consistent with the county greenways plan and include reviewing greenway connections beyond the official municipal boundary.

  2. Substantial citizen involvement/public participation throughout the process.




  1. A thorough examination and analysis of local conditions, questions or concerns related to developing the proposed greenways network.




  1. The development of an action plan that sets forth concrete steps, priorities and costs to establish the greenways network.




  1. The plan should be officially adopted as part of a municipality’s comprehensive plan.


D. Public Participation
Your scope of work must include a public participation process that substantially involves citizens to ensure that local attitudes are fully identified and addressed. Special attention should be given to involving significant property owners and stakeholder groups. Please review the Bureau’s "Public Participation Guide" for specific information. Grantees must have an approved public participation process that includes at least a study committee and two public meetings. Past grantees have found that citizen surveys and key person interviews provide useful results.
E. Study Report Organization and Final Products
Upon receipt and incorporation of the Bureau’s final comments, the final plan should be prepared. The final product can take a variety of forms depending on the approach taken by the grantee. It can either be a separately bound document or a chapter within a county/municipal comprehensive plan. The Bureau recommends producing an executive summary and at least twenty-five (25) copies of the narrative report. The exact number of copies should be stated in the scope of work and are based on the grantee’s needs. An electronic version and three (3) hard copies of the plan must be submitted to the Bureau.
F. Agency
The term "agency" is used throughout this Scope of Work Guidelines and refers to the entity that is preparing the plan such as a one municipality, a multi-municipal planning effort, etc.


                    G. Greenway Resources

For more information on the State Greenways Plan, visit the PA Greenways Clearinghouse Website at www.pagreenways.org. A Fact Sheet is available on County Greenways and Open Space Network Planning that provides a comprehensive list of useful resources that can assist in greenway planning activities.


II. ELEMENTS OF THE PLAN / PLANNING PROCESS
Although the process may vary according to the resources and character of each agency, there are common steps. This process begins with clarification of the plan’s purpose and scope, followed by inventory and analysis phases resulting in a proposal for development of a greenway network. It also includes preparation of a specific action plan to guide county/municipal implementation. A public participation process as outlined in Section III should guide the entire process.

A. Identify Purpose and Scope of Work


  • Describe the purpose of the plan noting any special or unique concerns, opportunities or priorities that will be addressed.




  • Establish the goals of the plan describing what the agency would like the plan to accomplish. Discuss any specific policy goals or objectives that relate to the use of greenways for different functions (e.g. recreation, wildlife migration, water quality protection, etc.)




  • Discuss how the agency, the general public and other stakeholders may use the plan. Specifically indicate how this plan will interface with the County Comprehensive Plan and other relevant plans.



  1. Inventory Existing Data and Related Plans

This involves the identification and mapping of what the existing natural resources, manmade features and linear greenway corridors are within the study area that might influence the development of the greenway network. They should also include any existing trails and other greenway corridors that extend beyond the boundaries of the study area that have potential for creating connections to form a greenway corridor that might be more regional in scope.


Agencies should build upon any existing data inventories and mapping for the county and perhaps other applicable regional planning efforts. These might include rivers conservation or watershed plans, heritage park management plans, non-motorized and motorized trail plans, comprehensive land use plans, comprehensive park, recreation and open space plans, transportation improvement plans or economic development/revitalization efforts.



Natural Resources (“green infrastructure”) – Inventory the following types of natural resources and natural resource-based hubs and linear corridors that currently exist in the study area that should be considered within the context of a greenways network. Data associated with the second and third bullet items below should be available as part of a completed County Natural Area Inventory (CNAI).




  • Water resources -- flood plains, wetlands, aquifer recharge zones and surface waters including lakes, ponds and river and stream corridors including wild and scenic rivers and those designated as special protection waters and waters supporting trout.




  • Natural areas – areas involving land, water or both land and water which are important in preserving plant and animal species, native ecological systems, geological, natural, historical, open space, scenic or similar features of scientific or educational value.




  • Important plant and animal species and their critical habitats including wildlife migration corridors. Critical habitat is defined by DCNR as area of land, water or both land and water which provides for rare, threatened or endangered plant and animal species or ecological or natural communities which are at risk of destruction or substantial degradation.



  • Forests and woodlands.




  • Public and other protected open space (e.g. state or local park land, game lands, private land protected by conservation easement, etc.).




  • Farmland including preserved acreage (i.e. covered by conservation easement) and other working or active agricultural land. Specifically identify those lands considered “primary agricultural land” as defined by Executive Order 1997-6.




  • Soils and geological features.




  • Steep slopes (15% or greater) and slide prone areas.




  • Ridge tops and scenic view sheds.


Manmade Resources (“gray infrastructure”) - Inventory the manmade hubs/destinations and linear corridors that currently exist in the study area that should be considered within the context of a greenways network.



  • Transportation and utility corridors and related facilities: Canals, abandoned rail lines, utility right-of ways, highway bike lanes, pedestrian walkways, park and ride lots, bus and train terminals, etc.




  • Recreation facilities: Public recreation facilities (passive or active), community and neighborhood parks, bikeways, walking/hiking paths, water trail and waterfront access areas, fitness trails, etc.




  • Cultural/Historic Sites: Interpretive centers, memorial sites, museums, historic districts, battlefields, tourism attractions, etc.

  • Population Centers and Destinations: Commercial areas, community centers, schools/educational complexes, libraries, business/industrial parks, shopping centers, villages, towns, brownfield redevelopment sites, etc.




  • Future development areas: Proposed residential, industrial, or commercial development areas, etc.




  1. Analyze Data and Develop Proposed Greenways Network Vision

This involves review and analysis of all data collected, synthesis of the results and identification of the agency’s vision for its greenway network. The result is a map and text to describe the proposed network. It should include a rationale for the proposal including any criteria, values or priorities set out to determine selection of the components identified as part of the greenway network. At this stage, input from stakeholders as part of the public participation process, will be critical in helping to establish the proposed greenway network vision and can provide a “reality check” for the proposal.




  • Identify potential greenway corridors based on the data gathered and inventoried above. Discuss the specific functions and associated benefits of each of the different types of proposed corridors to meet county goals including water and land trails to support recreation and opportunities for physical activity close to home, riparian buffer and conservation-oriented greenways to facilitate stormwater management, water quality protection and wildlife habitat and migration, and diversity in use options considering motorized versus non-motorized trails or hiking paths.




  • Identify hubs / destinations that are either natural resource-based or manmade (or a combination of the two) that should be part of the greenways network.




  • Specifically identify important and threatened open space that should be conserved as part of the greenways network including those ecologically or biologically significant areas or “hubs” that would have been identified in the CNAI or through other programs like the Natural Land Trust’s Smart Conservation or Conservation By Design programs.

Many of these areas are characterized by large, unfragmented tracts of different habitat blocks (e.g. oak forest, prairie, etc.) A specific examples of this kind of natural resource hub is the 8,800-acre “Hopewell Big Woods” in southeastern Pennsylvania known to be the last functioning oak forest in both southeast Pennsylvania and the entire Piedmont Region of the eastern United States.

To assess the conservation values of open space areas, consider developing a specific list of attributes (e.g. size, shape, diversity, landscape position for connectivity of habitat, current land use and relative protection status, etc.) that can be used to evaluate and prioritize areas for conservation within the greenways network.


  • Consider corridors and hubs that are known to support wildlife habitat and migration such as Pennsylvania Audubon’s Important Bird Areas or the Elk Range in northwestern PA that is home to the state’s elk herd.




  • Consider linkages between existing linear greenway corridors and major hubs or destinations both within the study area and those that make connections beyond local and county boundaries. Corridor connections beyond the study area’s boundaries may have regional, statewide or even national significance by providing long-distance recreational and alternative transportation opportunities as well as potentially important migration routes for wildlife. When such connections are made across multiple jurisdictions and landscapes, a comprehensive statewide system of greenways for Pennsylvania can emerge. Examples of such corridors include the Appalachian Trail, Schuylkill River Greenway, Susquehanna River Trail, The Great Allegheny Passage and the Delaware-Lehigh Canal Towpath.




  • Identify major “restorative” opportunities along river and stream corridors where riparian buffer greenways may be established or improved to address the water quality protection benefits of the greenways network.




  • Consider opportunities that might be provided by mine land reclamation and brownfield sites.




  • Prepare a map and text to illustrate the agency’s vision of proposed greenways network. Include rationale used for development of the proposal including any specific criteria or analysis used to determine the greenways network.

D. Mapping




  • Sections B & C above call for the development of maps to illustrate not only existing greenways network elements, but also the proposed greenway network envisioned by the agency and its stakeholders in the planning process. This mapping should be done at an appropriate scale where the goal is to show connections between corridors and hubs rather than parcel level identification. The scale should be useful for facilitating further greenways planning at the local or site-specific level. To support that purpose, maps should at least include municipal boundaries and major roads.

  • Agencies should also strive to generate maps using a Geographic Information System (GIS) in order to make statewide compilation of greenways network data a much simpler and efficient task. Those agencies looking for guidance on consistent standards and best practices for data set development and manipulation should consult the “Local Government Handbook for GIS – Implementation Within the Commonwealth of Pennsylvania.” The handbook, prepared by PaMAGIC, a consortium of GIS professionals and government agencies in the Commonwealth, can be accessed at www.pamagic.org/DataStds/DataStds.htm. Agencies can also contact DCNR’s Bureau of Topographic and Geologic Survey initiative (717) 702-2047 for guidance on developing geographical data that will be consistent with statewide standards and the PA-MAP initiative.




  • Data produced as a result of a Greenways and Open Space Network Plan grant shall become the property of the Commonwealth.




  1. Develop Action Plan

This involves development of a specific action plan that will position the agency to move forward in realizing the proposed greenways network vision. In preparing the Action Plan consider the following:


  • Creating a matrix of concrete actions for next steps laying out priorities for the short, medium and long-term time horizons.




  • For counties: Specify the life of the plan as 10 years to encourage synchronization with county planning initiatives, in particular, County Comprehensive Plans now required by the Municipalities Planning Code (MPC) to be reviewed for updating every 10 years.




  • For counties: Taking a multi-municipal approach to implementation of the county plan by municipalities. This will foster a network approach within the county facilitating opportunities for greenway corridors that cross municipal jurisdictions.




  • Identifying roles and responsibilities for each action step.




  • Estimating costs and resources and potential financing options needed to address actions steps.




  • Identifying greenway corridor segments as potential pilot projects to generate momentum for early implementation of the plan.




  • Reviewing and recommending model ordinance and land development regulation language that could be used to assist in implementing the plan (e.g. standards for riparian buffers along stream corridors, conservation by design, etc.) and/or identifying gaps and inconsistencies in existing local regulations.




  • Recommending the use of existing or new advisory groups (e.g. Environmental Advisory Councils, Recreation and Park Advisory Boards, State Health Improvement Partnerships, etc.) at the municipal or county level to act as greenways network champions.




  • Establishing methods for the long-term protection of the corridors and hubs proposed in the greenways network.




  • Setting up on-going mechanism for coordination with other counties, regional planning entities, municipalities, landowners and other stakeholders including local health improvement partners who are becoming valuable and interested parties in greenways planning and design.




  • Exploring partnerships with private organizations and corporations including hospitals and those involved in community health programs and services that could commit to the establishment and protection of the identified greenways network.




  • Determine and identify the opportunities and mechanisms necessary to facilitate any proposed inter-municipal and inter-county project opportunities.


F. Prepare Final Plan


  • A draft final plan document should be prepared and submitted for county and Bureau review. This should include the results of completing items A-E above. This should occur once the plan undergone final review and comment through the public participation process.




  • The Bureau must review and approve the complete draft plan before it is officially adopted by the agency. Typically, the review process consists of reviewing a complete draft plan, providing comments and then reviewing a revised draft to ensure comments are adequately addressed. Accordingly, one (1) copy of the complete draft plan must be submitted to the Bureau.




  • Upon receipt and incorporation of the Bureau’s final comments, the final plan should be prepared. The final product can take a variety of forms depending on the approach taken by the agency. It can either be a separately bound document or a chapter within a Comprehensive Plan plus attachments such as background and supporting resource documents. An electronic version and three (3) hard copies of the plan must be submitted to the Bureau.



          III. PUBLIC PARTICIPATION / COMMUNITY INVOLVEMENT PROCESS

The entire planning process should be guided by public participation that will fully engage the community and stakeholder groups. In particular, all municipalities in the county must be involved in the planning process as the county plan is intended to set a larger framework and vision for more localized greenway planning and development. The elements listed below should be part of the agency’s public participation process. Applicants can also review the Bureau’s "Public Participation Guide." Municipal applicants will need to tailor to their local needs.




    • Review the results of the community involvement activities of previous planning efforts and county initiatives.




    • Identify and engage key organizations (e.g. watershed organizations, trail steward groups, land trusts, heritage parks, economic development agencies, business concerns, hospitals and community health partners, school districts, non-profit groups and civic organizations, etc.) government representatives, and other individuals who can lend expertise to the process of identifying important resources and opportunities for linear connections, and the needs of community and environment.




    • Establish a Study Committee to guide the entire planning process.



Using a variety of techniques (e.g. public forums, design charrettes, stakeholder interviews, focus groups, student projects, surveys, etc.) solicit ideas and feedback on the greenway network plan as it is under development, using maps as key exhibits.


    • During the planning process seek participation from each municipality in the county and set up a process to keep them engaged throughout the project. Solicit municipal resolutions supporting the plan, its adoption and implementation.



Reach out to surrounding counties and adjacent municipalities outside the county boundaries to capture information about existing and potential connections.




Publicize the planning process and development of the plan. Distribute information on the plan including the proposed greenways network map, as widely as possible, including but not limited to every municipality, adjacent county, and participating organizations.




Summarize results of the public participation process in the plan.





Download 0,66 Mb.

Do'stlaringiz bilan baham:




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish