Branch Date of tariff decision (publishing date, newspaper)



Download 381 Kb.
Sana27.06.2017
Hajmi381 Kb.
#17186

branch

Date of tariff decision (publishing date, newspaper)

Capacity range, kW

Voltage level at connection point, kv

Payment rate, RUB per 1 kW net of VAT

"Belgorodenergo"

26.03.2010 (06.04.2010 «Belgorodskie

vesti»). Payment is fixed for 2010




up to 15 kW

Applicant that puts in an application for technological connection with connected capacity that does not exceed 15 kW inclusive, as well as for the purposes of temporary connection (taking the capacity previously connected in this connection point into account) provided that the distance from site boundaries of an applicant to objects of power grid facilities of voltage class necessary to an applicant of grid organization, in which the application has been put, is not more than 300 meters in cities and urban-type settlements and not more than 500 meters in villages, irrespective whether there is technical possibility of technological connection or not for the date of application

(inclusive of VAT).


0,4

550

Technological connection of legal entities – non-commercial organisations for power supply to citizens – members of this organization which is calculated according to general meter at lead-in provided that each member of the organisation connected not more than 15 kW

550*number of members

above 15 kW up to 100 kW inclusive

 

1 reliability category

460

2 reliability category

457

3 reliability category

230

above 100 up to 750 kW inclusive




1 reliability category

652

2 reliability category

640

3 reliability category

420

above 750 kW




1 reliability category

671

2 reliability category

652

3 reliability category

456

Up to 100 kW inclusive

6-10




3 reliability category

230

Payment for technological connection to electric grids of IDGC of Centre, JSC of voltage of 6-10 kv, 35 kv and above or capacity of 10 MVA and more is fixed individually in accordance with design estimate documentation.

For applicants – legal entities or individual entrepreneurs for the purposes of technological connection to one power supply source of power receivers which maximum capacity is up to 100 kW inclusive (taking the capacity previously connected in this connection point into account) as well as for individuals for the purposes of technological connection of power receivers which maximum capacity is up to 15 kW (taking the capacity previously connected in this connection point into account), used for domestic and other needs which are not connected with entrepreneur activity and power supply of which is provided by one source, in case of technological connection of power receivers of specified applicants to power grids of voltage class up to 20 kv inclusive, payment for technological connection according to individual project is not fixed.




“Voronezhenergo”


31.12.2008 (17.01.2009 No.4 «Voronezhsky kuryer»)


up to 15 kW ( inclusive of VAT )




550

up to 750 kW inclusive

0,4

18988

up to 750 kW inclusive

6-10

16129

above 750 kW is fixed individually

payment for TC is fixed individually on each connection for electric installations of the 2nd and 1st reliability category

"Kurskenergo"

23.12.2009

(30.12.2009 No. 52 «Kursk»)



An applicant with maximum connected capacity that does not exceed 15 kW inclusive as well as an applicant that puts in an application for the purposes of temporary (for the term not more than 6 months) technological connection of mobile objects with connected capacity that does not exceed 15 kW inclusive, provided that the distance from site boundaries of an applicant to objects of power grid facilities of voltage class necessary to an applicator of grid organisation, in which the application has been put, is not more than 300 meters in cities and urban-type settlements and not more than 500 meters in villages, RUB. (inclusive of VAT)




550

An applicant that puts in an application for the purposes of temporary (for the term not more than 6 months) technological connection of mobile objects with connected capacity up to 100 kW inclusive as well as up to 15 kW, which does not satisfy the requirements of the paragraph 1 of this table, RUB/kW (net of VAT)




303,65

An applicant that puts in an application for technological connection with connected capacity above 15 kW up to 100 kW inclusive as well as up to 15 kW, which does not satisfy the requirements of the paragraph 1 of this table, RUB/kW (net of VAT)

below 35 kv

9526,55

An applicant that puts in an application for technological connection with connected capacity above 100 kW up to 637,5 kW inclusive RUB/kW (net of VAT)




9636,35

An applicant that puts in an application for technological connection with connected capacity above 637,5 kW up to 8500 kW inclusive RUB/kW (net of VAT)




9914,38

"Lipetskenergo"

17.07.2009


up to 15 kW (inclusive of VAT)




550

Up to 15 kW inclusive, when connecting power receiving installations of III reliability category at technological connection of one-by-one power supply source, provided that the distance from site boundaries of an applicant to objects of power grid facilities of voltage class necessary to an applicant of grid organisation, in which the application has been put, is not more than 300 m in cities and urban-type settlements and not more than 500 m in villages:

- for legal entities and private entrepreneurs

- for individuals (inclusive of VAT)




550
649



up to 30 kW inclusive

0,4

8445

above 30 kW

9946

up to 750 kW inclusive

6-10

6601

Payment for temporary connection

0,4

1178

6-10

1985

Payment is fixed individually:

1). When connecting power receiving installations of III reliability category with maximum capacity up to 15 kW inclusive, provided that the distance from site boundaries of an applicant to objects of power grid facilities of IDGC of Centre, JSC is more than 300 meters in cities and urban-type settlements, more than 500 meters in villages;

2). When connecting power receiving installations of III reliability category with maximum capacity above 100 kW, if there is no technical capability of technical connection determined in accordance with the par.par. 29,30 of Technological connection regulations (Order of the Government of the Russian Federation No.861 dated 27.12.2004 with amendments);

3). When connecting power receiving installations of I and II reliability category;

4). When connecting power receiving installations above 750 kW;

5). When connecting power receiving installations at voltage of 35 kv and above;

6). When connecting power receiving installations by means of distribution of connected capacity;

7). When technological connection of objects of power grid facilities of other power grid organisations;









"Orelenergo"

12.09.2008 (14.09.2008 «Orlovskaya pravda»);

13.03.2009 (15.03.2009 «Orlovskaya pravda);



19.05.2009 (21.05.2009 «Orlovskaya pravda»)

up to 15 kW (inclusive of VAT)




550

An applicant that puts in an application for technological connection with connected capacity not exceeding 15 kW inclusive, provided that the distance from site boundaries of an applicant to objects of power grid facilities of voltage class necessary to an applicant is not more than 300 meters in cities and urban-type settlements and not more than 500 meters in villages, irrespective whether there is technical capability of technological connection or not for the date of application (inclusive of VAT)




550

up to 30 kW

1-0,4

 

1 reliability category

9342

2 reliability category

8831

3 reliability category

5257

from 30 up to 100 kW

1-0,4

 

1 reliability category

10694

2 reliability category

10387

3 reliability category

5770

from 100 kW up to 750 kW inclusive

1-0,4

 

1 reliability category

11877

2 reliability category

11258

3 reliability category

6186

up to 100 kW

6 kW and above

 

1 reliability category

10225

2 reliability category

9792

3 reliability category

6432

from 100 kW up to 750 kW inclusive

6 kW and above

 

1 reliability category

10949

2 reliability category

10764

3 reliability category

7011

above 750 kW is fixed individually

"Tambovenergo"

17.03.2009

(20.03.2009 No.93



Tambovskaya zhizn)

up to 15 kW (inclusive of VAT)




550

up to 750 kW inclusive

Up to 0,4

9031,8

up to 750 kW inclusive

6-10

5032,83

above 750 kW is fixed individually

"Bryanskenergo"

30.07.2009 (09.08.2009 No.11 «Ofitsialnaya bryanshchina»)

An applicant with maximum connected capacity of power receiving installations that does not exceed 15 kW inclusive ( taking the capacity previously connected in this connection point into account), pays for works, provided that the distance from site boundaries of an applicant to objects of power grid facilities of voltage class necessary to an applicant of grid organization, in which the application has been put, is not more than 300 meters in cities and urban-type settlements and not more than 500 meters in villages (inclusive of VAT)




550

From 15 up to 30 kW inclusive

1-0,4

7423,67

From 30 up to 100 kW inclusive

7946,7

From 15 up to 30 kW inclusive




7992,59

From 30 up to 100 kW inclusive

6(10)

9255,38

above 100 kW up to 750 kW inclusive

8974,23

"Tverenergo"

19.03.2008 (25.03.2008 No.54 «Tverskaya zhizn»)

up to 15 kW ( inclusive of VAT )




550

Territorial zone 1 : Belsky, Kuvshinovsky, Vesyegonsky, Zharkovsky, Kesovogorsky, Krasnokholmsky, Lesnoy, Maksakhatinsky, Molokovsky, Oleninsky, Sandovsky, Sonkovsky districts

up to 30 kW

0,4 kv

4900

from 30 kW up to 100 kW

5100

up to 100 kW

6-10 kv

3550

from 100 up to 750 kW

3850

above 750 kW

4050

Territorial zone 2 : Andreapolsky, Bezhetsky, Toropetsky, Zapadnodvinsky, Likhoslavsky, Rameshkovsky, Udomelsky, Nelidovsky, Firovsky districts

up to 30 kW

0,4 kv

6498

from 30 kW up to 100 kW

6958

up to 100 kW

6-10 kv

5060

from 100 up to 750 kW

5750

above 750 kW

5980

Territorial zone 3 : Kashinsky, Selizharovsky, Spirovsky districts

up to 30 kW

0,4 kv

7464

from 30 kW up to 100 kW

8027

up to 100 kW

6-10 kv

6406

from 100 up to 750 kW

6705

above 750 kW

6935

Territorial zone 4 : Bologovsky district, Vyshny Volochek, Vyshnevolotsky, Kalyazinsky, Penovsky, Staritsky, Ostashkovsky districts

up to 30 kW

0,4 kv

11213

from 30 kW up to 100 kW

11960

up to 100 kW

6-10 kv

9718

from 100 up to 750 kW

10350

above 750 kW

10580

Territorial zone 5 : Kimry, Kimrsky district, Rzhev, Rzhevsky district, Torzhok, Torzhovsky district

up to 30 kW

0,4 kv

12708

from 30 kW up to 100 kW

13455

up to 100 kW

6-10 kv

11213

from 100 up to 750 kW

11845

above 750 kW

12075

Territorial zone 6 : Zubtsovsky, Kalininsky, Konakovsky districts

up to 30 kW

0,4 kv

13455

from 30 kW up to 100 kW

13800

up to 100 kW

6-10 kv

11960

from 100 up to 750 kW

12593

above 750 kW

12823

Territorial zone 7 : Tver

up to 30 kW

0,4 kv

13743

from 30 kW up to 100 kW

13892

up to 100 kW

6-10 kv

12213

from 100 up to 750 kW

13225

above 750 kW

14203

above 10 000 kvA is fixed individually

"Smolenskenergo"

»


19.01.2009 (23.01.2009 No.5 «Smolenskaya gazeta»);

23.05.2008 (27.08.2008 No.41 «Smolenskaya gazeta»),




The first territorial zone, I category of power supply

Vyazma, Vyazemsky district, Gagarin, Gagarinsky district, Roslavl, Roslavlsky district, Safonovo, Safonovsky district, Smolensk, Smolensky district

up to 15 kW (inclusive of VAT)




550

up to 30 kW

1-0,4

13558,41

from 30 kW up to 100 kW

10918,34

above 100 kW

9689,95

The first territorial zone, II category of power supply

up to 30 kW

1-0,4

11621,49

from 30 kW up to 100 kW

9358,58

above 100 kW

8305,67

The first territorial zone, III category of power supply

up to 30 kW

1-0,4

9684,58

from 30 kW up to 100 kW

7798,82

above 100 kW

6921,40

The first territorial zone, I category of power supply

up to 100 kW

6-10

11937,05

from 100 up to 750 kW

10890,48

above 750 kW

9002,49

The first territorial zone, II category of power supply

up to 100 kW

6-10

10231,76

from 100 up to 750 kW

9334,70

above 750 kW

7716,42

The first territorial zone, III category of power supply

up to 100 kW

6-10

8526,46

from 100 up to 750 kW

7778,91

above 750 kW

6430,35

The second territorial zone, I category of power supply

Velizh, Velizhsky district, Demidov, Demidovsky district, Dukhovshchina, Dukhovshchinsky district, village Ershichi, Ershichsky district, settlement of Kardymovo, Kardymovsky district, urban-type settlement Krasny, Krasninsky district, settlement of Monastyrshchina, Monastyrshchinsky district, settlement of Novodugino, Novoduginsky district, Pochinok, Pochinkovsky district, Rudnya, Rudnyansky district, Sychevka, Sychevsky district, village Temkino, Temkinsky district, urban-type settlement Ugra, Ugransky district, urban-type settlement Kholm-Zhirkovsky, Kholm-Zhirkovsky district, settlement of Khislavichi, Khislavichsky district, settlement of Shumyachi, Shumyachsky district

up to 15 kW (inclusive of VAT)




550

up to 30 kW

1-0,4

12267,13

from 30 kW up to 100 kW

9878,50

above 100 kW

8767,10

The second territorial zone, II category of power supply

up to 30 kW

1-0,4

10514,68

from 30 kW up to 100 kW

8467,29

above 100 kW

7514,66

The second territorial zone, III category of power supply

up to 30 kW

1-0,4

8762,24

from 30 kW up to 100 kW

7056,07

above 100 kW

6262,21

The second territorial zone, I category of power supply

up to 100 kW

6-10

10800,19

from 100 up to 750 kW

9853,29

above 750 kW

8145,11

The second territorial zone, II category of power supply

up to 100 kW

6-10

9257,30

from 100 up to 750 kW

8445,68

above 750 kW

6981,53

The second territorial zone, III category of power supply

up to 100 kW

6-10

7714.42

from 100 up to 750 kW

7038,07

above 750 kW

5817,94

19.06.2009 (26.06.2009 No.49 «Smolenskaya gazeta»)

Up to 30 kW

0,4

255

From 30 up to 100 kW

155

Above 100 kW

70

Up to 100 kW

6-10

80

From 100 up to 750 kW

35

Above 750 kW

10

17.07.2009 (22.07.2009 No.60 (506) «Smolenskaya gazeta»)

For applicants with connected capacity of power receiving installations that does not exceed 15 kW inclusive (taking the capacity previously connected in this connection point into account), basing on the cost of measures on technological connection, provided that the distance from site boundaries of an applicant to objects of power grid facilities of voltage class necessary to an applicant is not more than 300 meters in cities and urban-type settlements and not more than 500 meters in villages (inclusive of VAT)




550

"Kostromaenergo"

27.03.2009 (01.04.2009. No.36 «Severnaya pravda»)

III reliability category

up to 15 kW (inclusive of VAT)




550

From 15 up to 100 kW inclusive

0,4-1,0 inclusive

8241

above 100 kW up to 750 inclusive

9174

up to 750 kW inclusive

Above 1,0

10509

II reliability category

up to 15 kW (inclusive of VAT)




8584

From 15 up to 100 kW inclusive

0,4-1,0 inclusive

9537

up to 750 kW inclusive

Above 1,0

11064

21.08.2009

For applicants with connected capacity of power receiving installations that does not exceed 15 kW inclusive ( taking the capacity previously connected in this connection point into account ), provided that the distance from site boundaries of an applicant to objects of power grid facilities of voltage class necessary to an applicant of grid organisation, in which the application has been put, is not more than 300 meters in cities and urban-type settlements and not more than 500 meters in villages (inclusive of VAT)




550

"Yarenergo"

30.11.2009 (29.12.2009 No. 39 magazine «Dokument -region»)

Categorizing coefficient

Reliability category of power supply

Reliability category of power supply

the first

1,4

the second

1,2

the third

1,0

Payment for technological connection is fixed individually:

  1. at temporary technological connection (for the term up to 6 months);

  2. At technological connection of consumers to any voltage level of capacity at least 750 kvA according to the first power supply reliability category;

  3. At technological connection of persons by means of redistribution of connected capacity

For applicants with connected capacity of power receiving installations that does not exceed 15 kW inclusive ( taking the capacity previously connected in this connection point into account ), provided that the distance from site boundaries of an applicant to objects of power grid facilities of voltage class necessary to an applicant of grid organisation, in which the application has been put, is not more than 300 meters in cities and urban-type settlements and not more than 500 meters in villages 550 RUB (inclusive of VAT)

Territorial Zone 1. Yaroslavl

up to 30 kW inclusive

1-0,4 inclusive

16000

from 30 up to 100 kW inclusive

17000

above 100 kW inclusive

19000

up to 30 kW inclusive

35-1

13000

from 30 up to 100 kW inclusive

14000

above 100 kW inclusive

16000

Territorial zone 2. Cities of regional subordination and administrative centres of district of Yaroslavl region, Yaroslavsky, Pereyaslavsky, Uglichsky and Nekrasovsky districts

up to 30 kW inclusive

1-0,4 inclusive

7000

from 30 up to 100 kW inclusive

9500

above 100 kW inclusive

12000

up to 30 kW inclusive

35-1

5000

from 30 up to 100 kW inclusive

7000

above 100 kW inclusive

9000

Territorial zone 3. Territory of districts of Yaroslavl region which are not specified in the territorial zones 1-2

up to 30 kW inclusive

1-0,4 inclusive

6000

from 30 up to 100 kW inclusive

7500

above 100 kW inclusive

9000

up to 30 kW inclusive

35-1

4000

from 30 up to 100 kW inclusive

5500

above 100 kW inclusive

8000

Download 381 Kb.

Do'stlaringiz bilan baham:




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish