branch
|
Date of tariff decision (publishing date, newspaper)
|
Capacity range, kW
|
Voltage level at connection point, kv
|
Payment rate, RUB per 1 kW net of VAT
|
"Belgorodenergo"
|
26.03.2010 (06.04.2010 «Belgorodskie
vesti»). Payment is fixed for 2010
|
up to 15 kW
Applicant that puts in an application for technological connection with connected capacity that does not exceed 15 kW inclusive, as well as for the purposes of temporary connection (taking the capacity previously connected in this connection point into account) provided that the distance from site boundaries of an applicant to objects of power grid facilities of voltage class necessary to an applicant of grid organization, in which the application has been put, is not more than 300 meters in cities and urban-type settlements and not more than 500 meters in villages, irrespective whether there is technical possibility of technological connection or not for the date of application
(inclusive of VAT).
|
0,4
|
550
|
Technological connection of legal entities – non-commercial organisations for power supply to citizens – members of this organization which is calculated according to general meter at lead-in provided that each member of the organisation connected not more than 15 kW
|
550*number of members
|
above 15 kW up to 100 kW inclusive
|
|
1 reliability category
|
460
|
2 reliability category
|
457
|
3 reliability category
|
230
|
above 100 up to 750 kW inclusive
|
|
1 reliability category
|
652
|
2 reliability category
|
640
|
3 reliability category
|
420
|
above 750 kW
|
|
1 reliability category
|
671
|
2 reliability category
|
652
|
3 reliability category
|
456
|
Up to 100 kW inclusive
|
6-10
|
|
3 reliability category
|
230
|
Payment for technological connection to electric grids of IDGC of Centre, JSC of voltage of 6-10 kv, 35 kv and above or capacity of 10 MVA and more is fixed individually in accordance with design estimate documentation.
For applicants – legal entities or individual entrepreneurs for the purposes of technological connection to one power supply source of power receivers which maximum capacity is up to 100 kW inclusive (taking the capacity previously connected in this connection point into account) as well as for individuals for the purposes of technological connection of power receivers which maximum capacity is up to 15 kW (taking the capacity previously connected in this connection point into account), used for domestic and other needs which are not connected with entrepreneur activity and power supply of which is provided by one source, in case of technological connection of power receivers of specified applicants to power grids of voltage class up to 20 kv inclusive, payment for technological connection according to individual project is not fixed.
|
“Voronezhenergo”
|
31.12.2008 (17.01.2009 No.4 «Voronezhsky kuryer»)
|
up to 15 kW ( inclusive of VAT )
|
|
550
|
up to 750 kW inclusive
|
0,4
|
18988
|
up to 750 kW inclusive
|
6-10
|
16129
|
above 750 kW is fixed individually
|
payment for TC is fixed individually on each connection for electric installations of the 2nd and 1st reliability category
|
"Kurskenergo"
|
23.12.2009
(30.12.2009 No. 52 «Kursk»)
|
An applicant with maximum connected capacity that does not exceed 15 kW inclusive as well as an applicant that puts in an application for the purposes of temporary (for the term not more than 6 months) technological connection of mobile objects with connected capacity that does not exceed 15 kW inclusive, provided that the distance from site boundaries of an applicant to objects of power grid facilities of voltage class necessary to an applicator of grid organisation, in which the application has been put, is not more than 300 meters in cities and urban-type settlements and not more than 500 meters in villages, RUB. (inclusive of VAT)
|
|
550
|
An applicant that puts in an application for the purposes of temporary (for the term not more than 6 months) technological connection of mobile objects with connected capacity up to 100 kW inclusive as well as up to 15 kW, which does not satisfy the requirements of the paragraph 1 of this table, RUB/kW (net of VAT)
|
|
303,65
|
An applicant that puts in an application for technological connection with connected capacity above 15 kW up to 100 kW inclusive as well as up to 15 kW, which does not satisfy the requirements of the paragraph 1 of this table, RUB/kW (net of VAT)
|
below 35 kv
|
9526,55
|
An applicant that puts in an application for technological connection with connected capacity above 100 kW up to 637,5 kW inclusive RUB/kW (net of VAT)
|
|
9636,35
|
An applicant that puts in an application for technological connection with connected capacity above 637,5 kW up to 8500 kW inclusive RUB/kW (net of VAT)
|
|
9914,38
|
"Lipetskenergo"
|
17.07.2009
|
up to 15 kW (inclusive of VAT)
|
|
550
|
Up to 15 kW inclusive, when connecting power receiving installations of III reliability category at technological connection of one-by-one power supply source, provided that the distance from site boundaries of an applicant to objects of power grid facilities of voltage class necessary to an applicant of grid organisation, in which the application has been put, is not more than 300 m in cities and urban-type settlements and not more than 500 m in villages:
- for legal entities and private entrepreneurs
- for individuals (inclusive of VAT)
|
|
550
649
|
up to 30 kW inclusive
|
0,4
|
8445
|
above 30 kW
|
9946
|
up to 750 kW inclusive
|
6-10
|
6601
|
Payment for temporary connection
|
0,4
|
1178
|
6-10
|
1985
|
Payment is fixed individually:
1). When connecting power receiving installations of III reliability category with maximum capacity up to 15 kW inclusive, provided that the distance from site boundaries of an applicant to objects of power grid facilities of IDGC of Centre, JSC is more than 300 meters in cities and urban-type settlements, more than 500 meters in villages;
2). When connecting power receiving installations of III reliability category with maximum capacity above 100 kW, if there is no technical capability of technical connection determined in accordance with the par.par. 29,30 of Technological connection regulations (Order of the Government of the Russian Federation No.861 dated 27.12.2004 with amendments);
3). When connecting power receiving installations of I and II reliability category;
4). When connecting power receiving installations above 750 kW;
5). When connecting power receiving installations at voltage of 35 kv and above;
6). When connecting power receiving installations by means of distribution of connected capacity;
7). When technological connection of objects of power grid facilities of other power grid organisations;
|
|
|
"Orelenergo"
|
12.09.2008 (14.09.2008 «Orlovskaya pravda»);
13.03.2009 (15.03.2009 «Orlovskaya pravda);
19.05.2009 (21.05.2009 «Orlovskaya pravda»)
|
up to 15 kW (inclusive of VAT)
|
|
550
|
An applicant that puts in an application for technological connection with connected capacity not exceeding 15 kW inclusive, provided that the distance from site boundaries of an applicant to objects of power grid facilities of voltage class necessary to an applicant is not more than 300 meters in cities and urban-type settlements and not more than 500 meters in villages, irrespective whether there is technical capability of technological connection or not for the date of application (inclusive of VAT)
|
|
550
|
up to 30 kW
|
1-0,4
|
|
1 reliability category
|
9342
|
2 reliability category
|
8831
|
3 reliability category
|
5257
|
from 30 up to 100 kW
|
1-0,4
|
|
1 reliability category
|
10694
|
2 reliability category
|
10387
|
3 reliability category
|
5770
|
from 100 kW up to 750 kW inclusive
|
1-0,4
|
|
1 reliability category
|
11877
|
2 reliability category
|
11258
|
3 reliability category
|
6186
|
up to 100 kW
|
6 kW and above
|
|
1 reliability category
|
10225
|
2 reliability category
|
9792
|
3 reliability category
|
6432
|
from 100 kW up to 750 kW inclusive
|
6 kW and above
|
|
1 reliability category
|
10949
|
2 reliability category
|
10764
|
3 reliability category
|
7011
|
above 750 kW is fixed individually
|
"Tambovenergo"
|
17.03.2009
(20.03.2009 No.93
Tambovskaya zhizn)
|
up to 15 kW (inclusive of VAT)
|
|
550
|
up to 750 kW inclusive
|
Up to 0,4
|
9031,8
|
up to 750 kW inclusive
|
6-10
|
5032,83
|
above 750 kW is fixed individually
|
"Bryanskenergo"
|
30.07.2009 (09.08.2009 No.11 «Ofitsialnaya bryanshchina»)
|
An applicant with maximum connected capacity of power receiving installations that does not exceed 15 kW inclusive ( taking the capacity previously connected in this connection point into account), pays for works, provided that the distance from site boundaries of an applicant to objects of power grid facilities of voltage class necessary to an applicant of grid organization, in which the application has been put, is not more than 300 meters in cities and urban-type settlements and not more than 500 meters in villages (inclusive of VAT)
|
|
550
|
From 15 up to 30 kW inclusive
|
1-0,4
|
7423,67
|
From 30 up to 100 kW inclusive
|
7946,7
|
From 15 up to 30 kW inclusive
|
|
7992,59
|
From 30 up to 100 kW inclusive
|
6(10)
|
9255,38
|
above 100 kW up to 750 kW inclusive
|
8974,23
|
"Tverenergo"
|
19.03.2008 (25.03.2008 No.54 «Tverskaya zhizn»)
|
up to 15 kW ( inclusive of VAT )
|
|
550
|
Territorial zone 1 : Belsky, Kuvshinovsky, Vesyegonsky, Zharkovsky, Kesovogorsky, Krasnokholmsky, Lesnoy, Maksakhatinsky, Molokovsky, Oleninsky, Sandovsky, Sonkovsky districts
|
up to 30 kW
|
0,4 kv
|
4900
|
from 30 kW up to 100 kW
|
5100
|
up to 100 kW
|
6-10 kv
|
3550
|
from 100 up to 750 kW
|
3850
|
above 750 kW
|
4050
|
Territorial zone 2 : Andreapolsky, Bezhetsky, Toropetsky, Zapadnodvinsky, Likhoslavsky, Rameshkovsky, Udomelsky, Nelidovsky, Firovsky districts
|
up to 30 kW
|
0,4 kv
|
6498
|
from 30 kW up to 100 kW
|
6958
|
up to 100 kW
|
6-10 kv
|
5060
|
from 100 up to 750 kW
|
5750
|
above 750 kW
|
5980
|
Territorial zone 3 : Kashinsky, Selizharovsky, Spirovsky districts
|
up to 30 kW
|
0,4 kv
|
7464
|
from 30 kW up to 100 kW
|
8027
|
up to 100 kW
|
6-10 kv
|
6406
|
from 100 up to 750 kW
|
6705
|
above 750 kW
|
6935
|
Territorial zone 4 : Bologovsky district, Vyshny Volochek, Vyshnevolotsky, Kalyazinsky, Penovsky, Staritsky, Ostashkovsky districts
|
up to 30 kW
|
0,4 kv
|
11213
|
from 30 kW up to 100 kW
|
11960
|
up to 100 kW
|
6-10 kv
|
9718
|
from 100 up to 750 kW
|
10350
|
above 750 kW
|
10580
|
Territorial zone 5 : Kimry, Kimrsky district, Rzhev, Rzhevsky district, Torzhok, Torzhovsky district
|
up to 30 kW
|
0,4 kv
|
12708
|
from 30 kW up to 100 kW
|
13455
|
up to 100 kW
|
6-10 kv
|
11213
|
from 100 up to 750 kW
|
11845
|
above 750 kW
|
12075
|
Territorial zone 6 : Zubtsovsky, Kalininsky, Konakovsky districts
|
up to 30 kW
|
0,4 kv
|
13455
|
from 30 kW up to 100 kW
|
13800
|
up to 100 kW
|
6-10 kv
|
11960
|
from 100 up to 750 kW
|
12593
|
above 750 kW
|
12823
|
Territorial zone 7 : Tver
|
up to 30 kW
|
0,4 kv
|
13743
|
from 30 kW up to 100 kW
|
13892
|
up to 100 kW
|
6-10 kv
|
12213
|
from 100 up to 750 kW
|
13225
|
above 750 kW
|
14203
|
above 10 000 kvA is fixed individually
|
"Smolenskenergo"
»
|
19.01.2009 (23.01.2009 No.5 «Smolenskaya gazeta»);
23.05.2008 (27.08.2008 No.41 «Smolenskaya gazeta»),
|
The first territorial zone, I category of power supply
|
Vyazma, Vyazemsky district, Gagarin, Gagarinsky district, Roslavl, Roslavlsky district, Safonovo, Safonovsky district, Smolensk, Smolensky district
|
up to 15 kW (inclusive of VAT)
|
|
550
|
up to 30 kW
|
1-0,4
|
13558,41
|
from 30 kW up to 100 kW
|
10918,34
|
above 100 kW
|
9689,95
|
The first territorial zone, II category of power supply
|
up to 30 kW
|
1-0,4
|
11621,49
|
from 30 kW up to 100 kW
|
9358,58
|
above 100 kW
|
8305,67
|
The first territorial zone, III category of power supply
|
up to 30 kW
|
1-0,4
|
9684,58
|
from 30 kW up to 100 kW
|
7798,82
|
above 100 kW
|
6921,40
|
The first territorial zone, I category of power supply
|
up to 100 kW
|
6-10
|
11937,05
|
from 100 up to 750 kW
|
10890,48
|
above 750 kW
|
9002,49
|
The first territorial zone, II category of power supply
|
up to 100 kW
|
6-10
|
10231,76
|
from 100 up to 750 kW
|
9334,70
|
above 750 kW
|
7716,42
|
The first territorial zone, III category of power supply
|
up to 100 kW
|
6-10
|
8526,46
|
from 100 up to 750 kW
|
7778,91
|
above 750 kW
|
6430,35
|
The second territorial zone, I category of power supply
|
Velizh, Velizhsky district, Demidov, Demidovsky district, Dukhovshchina, Dukhovshchinsky district, village Ershichi, Ershichsky district, settlement of Kardymovo, Kardymovsky district, urban-type settlement Krasny, Krasninsky district, settlement of Monastyrshchina, Monastyrshchinsky district, settlement of Novodugino, Novoduginsky district, Pochinok, Pochinkovsky district, Rudnya, Rudnyansky district, Sychevka, Sychevsky district, village Temkino, Temkinsky district, urban-type settlement Ugra, Ugransky district, urban-type settlement Kholm-Zhirkovsky, Kholm-Zhirkovsky district, settlement of Khislavichi, Khislavichsky district, settlement of Shumyachi, Shumyachsky district
|
up to 15 kW (inclusive of VAT)
|
|
550
|
up to 30 kW
|
1-0,4
|
12267,13
|
from 30 kW up to 100 kW
|
9878,50
|
above 100 kW
|
8767,10
|
The second territorial zone, II category of power supply
|
up to 30 kW
|
1-0,4
|
10514,68
|
from 30 kW up to 100 kW
|
8467,29
|
above 100 kW
|
7514,66
|
The second territorial zone, III category of power supply
|
up to 30 kW
|
1-0,4
|
8762,24
|
from 30 kW up to 100 kW
|
7056,07
|
above 100 kW
|
6262,21
|
The second territorial zone, I category of power supply
|
up to 100 kW
|
6-10
|
10800,19
|
from 100 up to 750 kW
|
9853,29
|
above 750 kW
|
8145,11
|
The second territorial zone, II category of power supply
|
up to 100 kW
|
6-10
|
9257,30
|
from 100 up to 750 kW
|
8445,68
|
above 750 kW
|
6981,53
|
The second territorial zone, III category of power supply
|
up to 100 kW
|
6-10
|
7714.42
|
from 100 up to 750 kW
|
7038,07
|
above 750 kW
|
5817,94
|
19.06.2009 (26.06.2009 No.49 «Smolenskaya gazeta»)
|
Up to 30 kW
|
0,4
|
255
|
From 30 up to 100 kW
|
155
|
Above 100 kW
|
70
|
Up to 100 kW
|
6-10
|
80
|
From 100 up to 750 kW
|
35
|
Above 750 kW
|
10
|
17.07.2009 (22.07.2009 No.60 (506) «Smolenskaya gazeta»)
|
For applicants with connected capacity of power receiving installations that does not exceed 15 kW inclusive (taking the capacity previously connected in this connection point into account), basing on the cost of measures on technological connection, provided that the distance from site boundaries of an applicant to objects of power grid facilities of voltage class necessary to an applicant is not more than 300 meters in cities and urban-type settlements and not more than 500 meters in villages (inclusive of VAT)
|
|
550
|
"Kostromaenergo"
|
27.03.2009 (01.04.2009. No.36 «Severnaya pravda»)
|
III reliability category
|
up to 15 kW (inclusive of VAT)
|
|
550
|
From 15 up to 100 kW inclusive
|
0,4-1,0 inclusive
|
8241
|
above 100 kW up to 750 inclusive
|
9174
|
up to 750 kW inclusive
|
Above 1,0
|
10509
|
II reliability category
|
up to 15 kW (inclusive of VAT)
|
|
8584
|
From 15 up to 100 kW inclusive
|
0,4-1,0 inclusive
|
9537
|
up to 750 kW inclusive
|
Above 1,0
|
11064
|
21.08.2009
|
For applicants with connected capacity of power receiving installations that does not exceed 15 kW inclusive ( taking the capacity previously connected in this connection point into account ), provided that the distance from site boundaries of an applicant to objects of power grid facilities of voltage class necessary to an applicant of grid organisation, in which the application has been put, is not more than 300 meters in cities and urban-type settlements and not more than 500 meters in villages (inclusive of VAT)
|
|
550
|
"Yarenergo"
|
30.11.2009 (29.12.2009 No. 39 magazine «Dokument -region»)
|
Categorizing coefficient
|
Reliability category of power supply
|
Reliability category of power supply
|
the first
|
1,4
|
the second
|
1,2
|
the third
|
1,0
|
Payment for technological connection is fixed individually:
-
at temporary technological connection (for the term up to 6 months);
-
At technological connection of consumers to any voltage level of capacity at least 750 kvA according to the first power supply reliability category;
-
At technological connection of persons by means of redistribution of connected capacity
|
For applicants with connected capacity of power receiving installations that does not exceed 15 kW inclusive ( taking the capacity previously connected in this connection point into account ), provided that the distance from site boundaries of an applicant to objects of power grid facilities of voltage class necessary to an applicant of grid organisation, in which the application has been put, is not more than 300 meters in cities and urban-type settlements and not more than 500 meters in villages 550 RUB (inclusive of VAT)
|
Territorial Zone 1. Yaroslavl
|
up to 30 kW inclusive
|
1-0,4 inclusive
|
16000
|
from 30 up to 100 kW inclusive
|
17000
|
above 100 kW inclusive
|
19000
|
up to 30 kW inclusive
|
35-1
|
13000
|
from 30 up to 100 kW inclusive
|
14000
|
above 100 kW inclusive
|
16000
|
Territorial zone 2. Cities of regional subordination and administrative centres of district of Yaroslavl region, Yaroslavsky, Pereyaslavsky, Uglichsky and Nekrasovsky districts
|
up to 30 kW inclusive
|
1-0,4 inclusive
|
7000
|
from 30 up to 100 kW inclusive
|
9500
|
above 100 kW inclusive
|
12000
|
up to 30 kW inclusive
|
35-1
|
5000
|
from 30 up to 100 kW inclusive
|
7000
|
above 100 kW inclusive
|
9000
|
Territorial zone 3. Territory of districts of Yaroslavl region which are not specified in the territorial zones 1-2
|
up to 30 kW inclusive
|
1-0,4 inclusive
|
6000
|
from 30 up to 100 kW inclusive
|
7500
|
above 100 kW inclusive
|
9000
|
up to 30 kW inclusive
|
35-1
|
4000
|
from 30 up to 100 kW inclusive
|
5500
|
above 100 kW inclusive
|
8000
|