Article in Revista Colombiana de Computación · January 001 Source: dblp citations reads 217 authors



Download 0,57 Mb.
Pdf ko'rish
bet9/27
Sana16.04.2022
Hajmi0,57 Mb.
#557795
1   ...   5   6   7   8   9   10   11   12   ...   27
Bog'liq
Organizational Indicators for CASE Tools Selection

Managerial support.
(MAN 1) The degree of 
support provided by the project managers of the IS-
developing unit to the CASE tools acquisition 
processes. Measured through three (3) variables. 
b)
Process of implementing technological 
innovations.
(MAN 2) The processes stipulated by 
the IS-developing unit for carrying out the 
acquisition and use of CASE tools within its 
development projects. This indicator will be 
measured through five (5) variables. 
c) 
Hardware and Software updating process.
(MAN 3) Processes stipulated by the IS-
developing unit to update the hardware (HW) and 
software (SW) when the acquisition and use of a 
CASE tool has been decided within the unit’s 
development projects. This indicator is measured 
through four (4) variables. 
d)
Training Plan.
(MAN 4) Processes stipulated in 
the IS-developing unit to update the knowledge of 
its IS-developers, at the time of adopting a CASE 
tool. This indicator will be measured through four 
(4) variables. 
e)
Organizational structure.
(MAN 5) Type of 
organizational structure that characterizes the IS-
developing unit, as well as its degree of flexibility 
to change and/or to be adapted to the effects of 
adopting the CASE tools. This indicator will be 
measured through three (3) variables. 
f)
Project management.
(MAN 6) Processes 
stipulated in the IS-developing unit for performing 
the management of the IS-development projects, 
taking into account the possible adoption of a 
CASE tool. This indicator will be measured 
through four (4) variables. 
OPERATION 
This refers to the development of operational processes 
within the IS-developing unit to conduct the IS-
developing projects, taking full advantage of the 
potentialities of the CASE tools and ensuring the 
success of the acquisition and management of 
technological innovations. Its indicators are: 
a) 

Download 0,57 Mb.

Do'stlaringiz bilan baham:
1   ...   5   6   7   8   9   10   11   12   ...   27




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish