Ams trex™ Device Communicator



Download 4,32 Mb.
Pdf ko'rish
bet12/127
Sana14.07.2022
Hajmi4,32 Mb.
#801095
1   ...   8   9   10   11   12   13   14   15   ...   127
Bog'liq
user-guide-ams-trex-device-communicator-ams-en-us-171738

Related information
LEDs on the power module
Status bar
2.6.5
Charge the power module
Fully charge the power module before using it in the field. The Trex unit is fully operable
when the power module is charging. An overcharge condition will not occur if the AC
adapter is connected after charging completes. You can charge the power module when it
is attached to or detached from the Trex unit.
To maintain performance, charge the power module frequently, preferably after each use.
Limit full discharges, if possible.
If you experience communication issues when working with a device, remove the AC
adapter from the Trex unit.
 WARNING
Do not install, remove, or charge the Lithium Ion (Li-Ion) power module in a hazardous
area environment.
Procedure
1. Plug the AC adapter into a power outlet.
2. Attach the AC adapter cable to the charger port on the lower left side of the Trex
unit.
A full charge takes approximately three to four hours.
2.6.6
Install the power module into the Trex unit
 CAUTION

Ensure sufficient grounding. Ensure the personnel, working surfaces, and packaging
are sufficiently grounded when handling electrostatically sensitive parts.

Avoid touching the pins on the connectors or components. Discharged energy can
affect the modules.
 WARNING
Do not install, remove, or charge the Lithium Ion (Li-Ion) power module in a hazardous
area environment.
Procedure
1. Place the Trex unit face down on a level, secure surface.
2. Align the power module with both sides of the Trex unit, and carefully place the
power module onto the Trex unit.
AMS Trex Device Communicator overview
User Guide
September 2021
22
User Guide


3. Insert and tighten the four screws with a Torx
®
screwdriver to secure the power
module. Do not over tighten the screws. Use 0.5Nm maximum torque load.
2.6.7
Remove the power module from the Trex unit
 CAUTION

Ensure sufficient grounding. Ensure the personnel, working surfaces, and packaging
are sufficiently grounded when handling electrostatically sensitive parts.

Avoid touching the pins on the connectors or components. Discharged energy can
affect the modules.

Download 4,32 Mb.

Do'stlaringiz bilan baham:
1   ...   8   9   10   11   12   13   14   15   ...   127




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish