Lower Bound Approach: 
The lower bound approach gives an estimate of the lower limit on the expected frequency of 
line stops per cycle. Here we assume that a station breakdown results in destruction of the 
part, resulting in removal of the part from the line & preventing its subsequent processing at 
the remaining workstations. 
Let Pi = the probability that the workpiece will jam at a particular station i. 
Then considering a given part as it proceeds through the line, Pi = probability that the part 
will jam at station 1 
(1 - Pi) = probability that the part will not jam station 1 & thus will available 
for processing at subsequent stations. A jam at station 2 is contingent on successfully 
making it through station 1 & therefore the probability that the same part will jam at station 
2 is given by
P (1 – P ) 
1 2 
Generalising the quantity 
P (1 – Pi - 1) (1 – Pi - 2) = (1 – P2) (1 – P1) 
Where i = 1,,2, ………. 
η
is the probability that a given part will jam at any station i. Summing all these probabilities 
from i = 1 through i = 
η
gives the probability or frequency of line stops per cycle. 
Probability that the given part will pass through all 
η
stations without a line stop is
η
π
(1 - Pi) 
i = 1 
Therefore the frequency of line stops per cycle is: 
η
F = 1 – 
π
(1 - Pi) --------------------------------- 10 
i = 1 
If all the probabilities, Pi, are equal, Pi = P, then
η
F = 1 - (1 - P) 
Because of parts removal in the lower bound approach, the number of parts coming of the 
line is less than the number launched onto the front of the line. 
If F= frequency of line stops & a part is removed for every line stop, then the proportion of 
parts produced is (1 - F). This is the yield of the production line. The production rate 
equation then becomes: 
Rap = 1 – F --------------------------------------- 11 
Tp 
where Rap = average actual production rate of acceptable parts from the line 
Tp = average cycle rate of the transfer machine 
Rp = 1 = average cycle rate of the system 
Tp 

Download 211,11 Kb.

Do'stlaringiz bilan baham:
1   2   3   4   5   6   7   8   9   ...   20




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish