The standard for project management


Table 7-1. Earned Value Calculations Summary Table



Download 5,05 Mb.
Pdf ko'rish
bet343/1107
Sana11.01.2022
Hajmi5,05 Mb.
#348685
1   ...   339   340   341   342   343   344   345   346   ...   1107
Bog'liq
PMBOK Guide (6th Edition)

Table 7-1. Earned Value Calculations Summary Table


268 

  

Part 1 - Guide

Status Date

1.00


>1

<1

TCPI


(BAC)

TCPI


(EAC)

Baseline Plan

Cumulative

CPI


Formula:

TCPI



Work Remaining

 (BAC-EV)

Funds Remaining

 (BAC-AC) or (EAC-AC)



Figure 7-13. To-Complete Performance Index (TCPI)

7.4.2.4 PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

Described in Section 4.3.2.2. Project management information systems are often used to monitor the three EVM 

dimensions (PV, EV, and AC), to display graphical trends, and to forecast a range of possible final project results.

7.4.3 CONTROL COSTS: OUTPUTS

7.4.3.1 WORK PERFORMANCE INFORMATION

Described  in Section 4.5.1.3. Work performance information includes information on how the project work is 

performing compared to the cost baseline. Variances in the work performed and the cost of the work are evaluated at 

the work package level and control account level. For projects using earned value analysis, CV, CPI, EAC, VAC, and TCPI 

are documented for inclusion in work performance reports (Section 4.5.3.1).




��

269


7.4.3.2 COST FORECASTS

Either a calculated EAC value or a bottom-up EAC value is documented and communicated to stakeholders.

7.4.3.3 CHANGE REQUESTS

Described in Section 4.3.3.4. Analysis of project performance may result in a change request to the cost and 

schedule baselines or other components of the project management plan. Change requests are processed for review 

and disposition through the Perform Integrated Change Control process (Section 4.6).

7.4.3.4 PROJECT MANAGEMENT PLAN UPDATES

Any change to the project management plan goes through the organization’s change control process via a change 

request. Components that may require a change request for the project management plan include but are not limited to:

u

u




Download 5,05 Mb.

Do'stlaringiz bilan baham:
1   ...   339   340   341   342   343   344   345   346   ...   1107




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish