Part 1 - Guide
u
u
Milestone charts.
These charts are similar to bar charts, but only identify the scheduled start or completion of
major deliverables and key external interfaces. An example is the milestone schedule portion of Figure 6-21.
u
u
Project schedule network diagrams.
These diagrams are commonly presented in the activity-on-node
diagram format showing activities and relationships without a time scale, sometimes referred to as a pure
logic diagram, as shown in Figure 6-11, or presented in a time-scaled schedule network diagram format that
is sometimes called a logic bar chart, as shown for the detailed schedule in Figure 6-21. These diagrams, with
activity date information, usually show both the project network logic and the project’s critical path schedule
activities. This example also shows how each work package is planned as a series of related activities.
Another presentation of the project schedule network diagram is a time-scaled logic diagram. These diagrams
include a time scale and bars that represent the duration of activities with the logical relationships. They are
optimized to show the relationships between activities where any number of activities may appear on the
same line of the diagram in sequence.
Figure 6-21 shows schedule presentations for a sample project being executed, with the work in progress reported
through as-of date or status date. For a simple project schedule model, Figure 6-21 reflects schedule presentations in
the forms of (1) a milestone schedule as a milestone chart, (2) a summary schedule as a bar chart, and (3) a detailed
schedule as a project schedule linked bar chart diagram. Figure 6-21 also visually shows the relationships among the
different levels of detail of the project schedule.
��
219
Project Schedule Time Frame
Period 5
Period 1
Period 2
Period 3
Activity
Identifier
1.1.MB
Begin New Product Z
Period 4
Calendar
units
Calendar
units
Calendar
units
Complete Component 1
Complete Component 2
Finish New Product Z
0
0
0
0
Activity Description
Project Schedule Time Frame
Period 5
Period 1
Period 2
Period 3
Activity
Identifier
1.1.MB
0
120
67
20
33
14
0
53
14
28
11
0
53
14
32
0
7
0
Period 4
Activity Description
1.1.1.M1
1.1.2.M1
1.1.3.MF
Complete Integration of Components 1 & 2
0
1.1.3.M1
Project Schedule Time Frame
Period 5
Period 1
Period 2
Period 3
Activity
Identifier
1.1
Develop and Deliver New Product Z
Period 4
Work Package 1: Component 1
Work Package 2: Component 2
Work Package 3: Integrated Components 1 and 2
120
67
53
53
Activity Description
1.1.1
1.1.2
1.1.3
Milestone Schedule
Data Date
Data Date
Detailed Schedule
1.1.1.T
1.1
1.1.1
1.1.1.D
1.1.1.B
1.1.2.T
1.1.1.M1
1.1.2
1.1.2.D
1.1.2.B
1.1.3.M1
1.1.2.M1
1.1.3
1.1.3.G
1.1.3.T
Data Date
SS
FS
1.1.3.P
1.1.3.MF
Summary Schedule
Begin New Product Z
Develop and Deliver Product Z
Work Package 1: Component 1
Design Component 1
Build Component 1
Test Component 1
Complete Component 1
Work Package 2: Component 2
Design Component 2
Build Component 2
Test Component 2
Complete Component 2
Work Package 3: Integrated Components 1 and 2
Integrate Components 1 and 2 as Product Z
Complete Integration of Components 1 and 2
Test Integrated Components as Product Z
Deliver Product Z
Finish New Product Z