Project Name: US 101: Camp Rilea – Surf Pines

Subject: DSTIP Units and Estimates




Possible Unit Staging Corridor



UNIT 1: (Fort Stevens Highway – Camp Rilea)

$ Million

1) Construct new overpass for Fort Stevens Highway.

4.5

2) Connect abandoned section of Fort Stevens Highway to new section approaching overpass.

1.0

3) Extend Fort Stevens Highway south on east side of Oregon Coast Highway to Camp Rilea access.

4.0

4) Disconnect existing Fort Stevens Highway and Perkins Road connections to Oregon Coast Highway.

0.5

5) Construct west side backage road between Camp Rilea access and Patriot.

4.0

6) Disconnect all accesses between Fort Stevens Highway and Camp Rilea access.

0.5

7) Construct interchange at Camp Rilea access or temporary at grade intersection.

14.0







UNIT 2: (Camp Rilea – Cullaby Lake Road)




  1. Construct east side backage road between Camp Rilea and Cullaby Lake Road

10.0

  1. Replace narrow Glenwood Overcrossing bridge on Oregon Coast Highway with necessary approach improvements.

4.0

  1. Improve road running beneath Glenwood Overcrossing and connect with new west side backage road described in four.

1.0

  1. Construct west side backage road between Glenwood Overcrossing road and Camp Rilea cemetery.

2.5

  1. Disconnect all east side access points, including Glenwood Village between Camp Rilea and Cullaby Lake Road.

0.5

  1. Disconnect all west side access points between Camp Rilea and Sunset Beach Road.

0.5

  1. Construct temporary at grade intersection Cullaby Lake Road.

1.0







UNIT 3: (Sunset Beach Road – ODOT Weigh Station)




  1. Construct Sunset Beach Road over crossing on Oregon Coast Highway

5.0

  1. Extend and disconnect Sunset Beach Road to east side backage road

2.0

  1. Construct new west side backage road between Sunset Beach Road and southerly southbound on-ramp.

2.0

  1. Construct southerly southbound on-ramp

1.0

  1. Construct southerly northbound on-ramp, connect to easterly backage road, and connect Cullaby Lake Road to easterly backage road.

2.0

  1. Disconnect remaining accesses to Oregon Coast Highway on both sides of highway.

0.5







UNIT 4: (ODOT Weigh Station – Surf Pines)




1) Construct Corrected Horizontal and Vertical Alignment on Oregon Coast Highway

10.0

2) Construct Continuous Left Turn Lane and Passing Lane Sections Between West Lake Rd. and Surf Pines Rd.

2.5

TOTAL

73 Million

6% For DSTIP

4.4 Million







Glenwood Turn Lane and Frontage Road Only




1) Construct east side backage road to collect all local accesses

2.0

2) Replace narrow Glenwood Overcrossing bridge on Oregon Coast Highway with necessary approach improvements.

4.0

3) Improve road running beneath Glenwood Overcrossing

1.0

TOTAL

7 Million

6% For DSTIP

0.4 Million

Download 53,5 Kb.

Do'stlaringiz bilan baham:




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish