Страница 1 мировой engineering стандарты общая спецификация



Download 1,29 Mb.
Pdf ko'rish
bet119/435
Sana02.08.2022
Hajmi1,29 Mb.
#846314
1   ...   115   116   117   118   119   120   121   122   ...   435
Bog'liq
WORLDWIDE ENGINEERING STANDARDS General Motors Local Ar

Procedure 3: 
(if sub-function $03 is supported).
1. Send a $10 message with $level = $03 and then activate a device control. Send TesterPresent messages
for a time greater than P3
Cmax 
(but less than any device control restriction timer) and then create a failure
which would set a DTC. Verify that the DTC is set via the $A9 service (undo the failure condition created
and clear DTCs prior to proceeding to step 2 of this procedure).
2. Send a $10 message with $Level = $03 and then activate a device control. Next send a $10 message with
$level = $02. Create a failure which would set a DTC and then verify that no DTC is set.
3. Send a $10 message with $Level = $03 while device control is already active and verify the negative
response ($7F $10 $22).
4. Send a service $28 message on the link and verify the positive response. Then send a $10 request with
$Level = $03 and verify the negative response ($7F $10 $22).
Procedure 4: 
(if sub-function $04 is supported).
1. Send a $10 request with $Level = $04 and verify that the device performs the appropriate wake-up
mechanism on all GMLAN subnets that it is connected to that support a wake-up.
2. If the wake-up mechanism on any GMLAN link requires continuous activation to keep the ECUs awake
(e.g., gateway provides power through a relay to ECUs on a specific subnet), then send messages to the
gateway to keep the gateways diagnostic VN active. Periodically check that the tester can communicate to
other ECUs on the subnet via diagnostic services. This test should be performed under conditions where
the ECU would otherwise let the link go down if the diagnostic VN were not active. Allow the diagnostic VN
to end, and then verify that communications with other ECUs is no longer possible.
--``,,``````,``,,``,,,`,`,`,,-`-`,,`,,`,`,,`---
Page 83
GM WORLDWIDE ENGINEERING STANDARDS

Download 1,29 Mb.

Do'stlaringiz bilan baham:
1   ...   115   116   117   118   119   120   121   122   ...   435




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish