1.
Define the V&V strategy.
2.
Verify the software architecture.
3.
Validate the physical architecture.
4.
Document the results of V&V.
15.1
Define the V&V strategy
The V&V activities and tasks must be incorporated into the software engineering
plans. V&V tasks are intended to review completed work products and ensure their
adequacy. This involves examining the assumptions made concerning the opera-
tional scenarios each architectural design mechanism was meant to tolerate. V&V
tasks should be conducted by members of the software engineering team who
Do'stlaringiz bilan baham: |