Task II. Answer to the following questions: Think about the four pieces of equipment mentioned in the texts. What are they for?
How do you think the top crane was removed at the end of the construction phase?
Task III. Write these sentences in another way so that the emphasis changes.
We need to sort out the delivery. The delivery needs sorting out.
1 We need to improve the quality of the concrete.
2 We need to revise the schedule.
3 We need to cover the sand before it starts to rain.
4 We need to inspect the wiring .
5 We need to go through the contract.
6 We need to fill in the trench by 5 p.m
Task IV. Choose one of these pieces of equipment. Write down five things you should check regularly as part of a maintenance programme. Backhoe bulldozer cement pump crane fork lift truck generator