Introduction to Health and Safety at Work


Appendix 20.1 The practical assessment



Download 5,86 Mb.
Pdf ko'rish
bet711/722
Sana20.07.2022
Hajmi5,86 Mb.
#825654
1   ...   707   708   709   710   711   712   713   714   ...   722
Bog'liq
introduction to health safety at work

Appendix 20.1 The practical assessment


 
Appendix 20.1 The Practical Assessment
Introduction to Health and Safety at Work
436
NATIONAL GENERAL 
Candidate’s observation
CERTIFICATE 
sheet
Unit NGC3 – Health and safety 
 
Sheet number 1 of 6
practical application
Candidate name J Brown 
Candidate number 
C
9887
Place inspected S & J Joinery Training Workshops 
Date of inspection 7 / 6 / 2007
Observations 
Priority/risk 
Actions to be taken (if any) 
Time scale
List hazards, unsafe practices and
 
(H, M, L)
 
List all immediate 
and
longer-term
 
(immediate,
good practices 
actions required 
1 week, etc)
GENERAL OBSERVATIONS
1.
Several risk and COSHH assessments

Complete specifi c risk assessment for 
Immediate
have been completed but the special risk
young persons.
assessment required by the Management Regs.
Establish a review timetable for all risk 
1 month
for young workers has not been done.

and COSHH assessments.
Discuss all risk assessments at the
Each year
Health and Safety committee meeting.
2.
No Fire Exit signs are posted in the building.

Inform employees and trainees 
Immediate
(Fire Regs) 
of fi re escape routes.
Obtain and install fi re exit signs and
1 week
review 
fi re risk assessment.
Organise some basic fi re training. 
1 month
3.
Emergency exit door is locked to protect

Remove timber and any other obstacles 
Immediate
building against unauthorised entry. Also the
and unlock door.
door was obstructed by several lengths 

Look for an alternative security 
1 month
of timber. (Fire Regs) 
arrangement and install.
Monitor doors regularly and include this
Monthly
problem in the fi re training.
4.
No fi re drills have been undertaken for some 

Undertake an immediate trial evacuation 
1 week
time. (Fire Regs) 
of the building to designated assembly point.
Arrange 1 fi re drill for all new trainees. 
1 week after
enrolment
Arrange at least 2 fi re drills for employees
6 months
per year and record evacuation time.
5. All electrical equipment, other than electric fi re
– 
Arrange for the fi re and the sander to be 
1 week after
in the offi ce and the sander in the workshop
PAT tested when repairs completed. 
repairs.
(see later), has been PAT tested. 
All hand-held tools should be checked 
Weekly
each week and PAT tested very 6 months. 
6 months
Ensure that records are kept and equipment
Each year
re-tested at regular intervals. 



Download 5,86 Mb.

Do'stlaringiz bilan baham:
1   ...   707   708   709   710   711   712   713   714   ...   722




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish