17.8 
Construction (Design and Management) (CDM) Regulations 2007


17.8.2
Outline of Regulations, Application and 
Notifi cation
The Regulations are divided into fi ve parts. Part 1 of 
the Regulations deals with matters of interpretation 
and application. The Regulations apply to all construc-
tion work in great Britain and it’s territorial waters, and 
apply to both employers and self-employed without 
distinction.
Part 2 covers general management duties which 
apply to all construction projects, including those which 
are non-notifi able.
Part 3 sets out additional management duties which 
apply to projects above the notifi cation threshold (projects 
lasting more than 3 days, or involving more than 500 
person days of construction work). These additional duties 
require particular appointments or particular documents 
which will assist with the management of health and 
safety from concept to completion.
Part 4 of the Regulations apply to all construc-
tion work carried out on construction sites, and covers 
physical safeguards which need to be provided to prevent 
danger. Duties to achieve these standards are held by 
contractors who actually carry out the work, irrespect-
ive of whether they are employers or are self-employed. 
Duties are also held by those who do not do construction 
work themselves, but control the way in which the work is 
done. In each case, the extent of the duty is in proportion 
to the degree of control which the individual or organiza-
tion has over the work in question.
This does not mean that everyone involved with 
design, planning or management of the project legally 
must ensure that all the specifi c requirements in Part 4 
are complied with. They only have duties if, in practice, 
they exercise suffi cient control over the actual working 
methods, safeguards and site conditions. If, for example, 
a client specifi es that a particular job is done in a particu-
lar way then the client will have a duty to make sure that 
their instructions comply with the requirements.
Contractors must not allow work to start or continue 
unless the necessary safeguards are in place; whether 
they are providing the safeguards, or using something; 
for example, a scaffold supplied by someone else.
Download 5,86 Mb.

Do'stlaringiz bilan baham:
1   ...   520   521   522   523   524   525   526   527   ...   722




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2025
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish