The following measures need to be undertaken to minimize or compensate this
impact:
•
Contractors and the PMC will inform the population about the anticipated works in
the settlement in advance;
•
For project sites located close to the settlements (Tashkent, Syrdarya and
Namangan), Contractors will be required to develop traffic management plans that
clearly indicate the routes of vehicle movements, the placement special signs, the
speeds allowed inside of the settlements, and the
schedule of transportation
activities to avoid peak traffic periods;
•
The traffic management plans will be approved by the Traffic Police and disclosed
to local communities prior to the commencement of construction works at sites;
•
Clear signs will be placed at construction sites in view of the public, warning people
of potential dangers such as moving vehicles, hazardous materials and
excavations, and raising awareness on safety issues.
•
All construction sites will be properly lightened and fenced;
•
For construction sites
located close to settlements, the development of Site
Specific Plans for campsites will be required in the case of creating of construction
camps;
•
After completion of the works, all roads shall be rehabilitated at least up to the
condition of the pre-construction stage;
•
Carry out regular awareness campaigns among work staff,
including specific
hazards associated with the spread of HIV/AIDS.
344.
Due to the limited scope of civil works, it is more likely that workers involved in the
construction activities will be accommodated inside of settlements located close to
construction sites. At the same time, the accommodation of workers in the construction
camps will be also possible.
345.
Construction sites and areas used for construction camps without proper cleaning
and reinstatement works will cause damage and inconvenience to
local communities due to
debris, spoils, and excess construction materials. In cases when workers camps will have to
be established a Site Specific Construction Camp Management Plan has to be developed by
the Contractor and approved by the PMC and the PMU.
346.
As minimum requirements for SSCCMP, the document should cover the following
topics:
•
After completion of construction, the Contractor shall provide full reinstatement of
the construction and camp sites by bringing them
to their primary condition;
•
Remove all rubbish, or temporary structures (such as buildings, shelters, and
latrines) which are no longer required;
•
All disrupted utilities need to be restored, and all affected structures rehabilitated
and
compensated;
•
The area that previously housed the construction camp is to be checked for spills
of substances such as oil and paint. and these shall be properly cleaned up;
•
All hardened surfaces within the construction camp area shall be ripped, all
imported materials removed;
•
The PMC will conduct a post-construction audit during the defect liability period in
order to ensure that construction sites and camps are properly cleaned and
restored to pre-project conditions before the acceptance of the works and hand
over to the Toza Hudud.