F I g u r E 3 . 8
Parallel Development of Two or More Geothermal Fields Reduces Resource Risk
Source | Authors.
Geothermal 
Field 3
Geothermal 
Field 4
Geothermal 
Field 5
Portfolio Exploration
Phases 1-4
Parallel
Development
Phases 4-7
Geothermal 
Field 1
Geothermal 
Field 2
Total
100 MW
Total
200 MW
Total
300 MW
+
+
+
MW
Step 1
MW
Step 2
50
+
+
50
50
MW
Step 3
50
+
+
50
50
Step 1
MW
Step 2
MW
Step 3
MW
Stepwise Field Expansion


110
G e o t h e r m a l H a n d b o o k : P l a n n i n g a n d F i n a n c i n g P o w e r G e n e r a t i o n 
Of course, parallel development could be extended to additional geothermal fields in the country 
based on the same principle. One 50 MW plant built in each of three geothermal fields, for example, 
could make 150 MW of geothermal power available to the country’s power system within the period of 
time it takes to install a 50 MW project in just one field. 
In contrast, committing the entire geothermal development budget of the country to a 150 MW plant 
built in a single geothermal field would be a riskier proposition and could take more time for reasons 
mentioned earlier.
B O x 3 . 1 1
Experience from Application of the Stepwise Expansion in Kenya
The Kenyan Olkaria geothermal power project is an example of stepwise development. The field is located in 
Kenya’s Rift Valley, about 120 km from Nairobi. The first power plant, Olkaria I, was commissioned in 1981 
with a capacity of 15 MW, then enlarged to 45 MW. The Olkaria II plant followed in the 1990´s with two 35 MW 
generators; it was enlarged in 2009 by another 35 MW. An IPP generates 12 MW at the Olkaria III site with a 
binary bottoming cycle. KenGen, the generating company, has plans to enlarge the Olkaria field from 170 MW to 
over 400 MW in the coming years, by deploying 4 new 70 MW power plants. Parallel to these activities, at least 
two other fields are expected to provide several hundred megawatts each.
Source | Magnus Gehringer based on Mwangi 2005.

Download 5,56 Mb.

Do'stlaringiz bilan baham:
1   ...   150   151   152   153   154   155   156   157   ...   177




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish