Basis of estimates.
Described in Sections 6.4.3.2 and 7.2.3.2. The basis of estimates is used to evaluate how
the estimation of durations, cost, resources, and cost control compared to the actual results.
u
u
Change log.
Described in Section 4.6.3.3. The change log contains the status of all change requests throughout
the project or phase.
u
u
Issue log.
Described in Section 4.3.3.3. The issue log is used to check that there is no open issue.
u
u
Lessons learned register.
Described in Section 4.3.3.1. The lessons learned in the phase or project will be
finalized before being entered into the lessons learned repository.
u
u
Milestone list.
Described in Section 6.2.3.3. The milestone list shows the final dates on which the project
milestones have been accomplished.