390
◾
Introduction to Industrial Automation
3. When the PLC receives an “empty” signal (S
1
or S
3
), then the electrovalve V
1
or V
2
opens
immediately and
the central electrovalve V
0
opens after 5 s. Then, when the signal “fill” (S
2
or S
4
) is received, the electrovalve V
0
closes immediately and the electrovalve V
1
or V
2
closes
after 10 s.
4. All electrovalves close immediately after the press of the OFF button.
Design a diagram with the connection statuses of the I/O devices and the corresponding addresses,
and subsequently, write the required PLC program.
Do'stlaringiz bilan baham: