Introduction to Industrial Automation


the line (a) and before the T connections of the bus (b)



Download 43,9 Mb.
Pdf ko'rish
bet269/440
Sana01.01.2022
Hajmi43,9 Mb.
#294756
1   ...   265   266   267   268   269   270   271   272   ...   440
Bog'liq
Introduction to Industrial Automation by Stamatios Manesis, George

the line (a) and before the T connections of the bus (b).

Lightning protection device for power lines

Lightning protection device for data network

Power Cables

Signal Cables

Network Cables

Concrete-encased

grounding electrode

P

P

P



P

P

P



N

N

N



N

N

N



N

N

Lightning protection device for power lines



Lightning protection device for data network

Power cables

Signal cables

Network cables

Equipotential copper plate

Concrete base



Figure 6.48  Lightning protection through the potential equalization and use of suitable protec-

tive devices for all kinds of cables.


Basic Operating Principles of PLCs 



 



255

the solid-state switch, contained in a digital output module, is connected to a high impedance 

output device. In this case, it is possible to actuate the output device incorrectly without a real 

trigger signal from the CPU.

In both cases, the cause of the error is the fact that the switching solid state elements, presented 

either in the output circuits of the PLC or in the input devices that are connected to the PLC, pro-

duce a leakage current when they are in the OFF state. The leakage current, which may range from 

1 to 20 mA, is capable of causing an inappropriate activation of either the input of the PLC or the 

load that is connected to the output of the PLC. These two cases are presented in Figure 6.51. In 

order to address this problem, a resistive load (or, in general, an impedance) should be inserted in 

parallel to the input circuit impedance (Z) or to the high impedance output device (Z), a process 

that it is called “impedance adjustment of the input or the output”. The calculation of the required 

resistive load is rather simple and, in both cases, will be described in what follows in the form of 

numerical examples.

Ps

C

P



U

Ps

C



P

U

Electrical enclosure no.1



Plc

Plc


Pe

Pe

L



1

Mpi


Mpi

Equipotential conductor

Network

Network


Zone 2 lightning protection

Zone 2 lightning protection

Zone 0 lightning protection

Ps

C



P

U

Ps



C

P

U



Electrical enclosure no. 2

Plc


Plc

Pe

Pe



L

2

Mpi



Mpi

Zone 2 lightning protection

Zone 2 lightning protection

Zone 0 lightning protection

PS

C

P



U

PS

C



P

U

PLC



PLC

PE

PE



L

3

N Pe



MPI

MPI


Zone 1 lightning protection

Zone 2 lightning protection

Zone 2 lightning protection

Figure 6.50  Electric connection pattern of two PLCs inside corresponding enclosures for pro-


Download 43,9 Mb.

Do'stlaringiz bilan baham:
1   ...   265   266   267   268   269   270   271   272   ...   440




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish