VI. CORRECTIVE ACTIONS REQUIRED
-
Actual to Requirements. If the results of the actual manufacturing process do not meet customer requirements for on-going quality and quoted tool capacity, corrective action must be taken to correct any non-conformances.
-
Actual to Plan. If the manufacturing and quality plan do not agree with the actual process, changes must be made to bring them into agreement.
-
Nonconformances. If nonconformances occurred during the Run @ Rate which were not identified previously by the normal PPAP control plan, a corrective action plan needs to be put in place (i.e., error proofing or a change in the control plan) and documented in the PFMEA and/or process flow diagram.
Do'stlaringiz bilan baham: |