Performance requirements contract with complete maintenance and operation 
responsibility 
A performance requirements contract where the contractor undertakes the entire process 
from design (also some system design) and construction to maintenance and operations. 
This undertaking includes all technical areas. The undertaking for operations and 
maintenance is for a longer period than a normal performance requirements contract and 
is not an extended guarantee but a separate undertaking. Contractors provide a type of 
“service”, i.e. to design, build, and then provide infrastructure for an agreed time. Part 
of the payment is made during the operational period and the size of the payment is 
dependent on the quality of the “service” provided. If contracted performance 
requirements are not met, i.e. if the facility does not provide the correct level of 
accessibility, then deductions are made from payments. A performance requirements 
contract with complete maintenance and operation responsibility is currently taking 
place in the Norrortsleden project. 
A performance requirements contract with complete maintenance and operation 
responsibility could be said to have most of the qualities associated with PPP projects 
but excludes private finance. 



0.3.2 
What is PPP? 
PPP is a long-term contract between the public sector (possibly together with other 
stakeholders) and a private player, which could be a company or a consortium, to 
provide a public service. The service could be to provide a road or railway, a hospital 
etc. 
 
The private company is responsible for financing and building the necessary 
infrastructure and then providing the necessary services for the agreed period, often 20-
30 years. The facility is then returned to public ownership. 
Payment could be made in several different ways to the project company. One variation 
is that payments are made at an agreed amount per year during the period of the 
contract, a payment that is linked to the service supplied and its quality. Another 
variation is that payment is made as a shadow toll, which means payment is entirely or 
Download 85,62 Kb.

Do'stlaringiz bilan baham:
1   2   3   4   5   6   7   8   9   10




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish