Microsoft Word mis603-dec2007. doc



Download 4,9 Mb.
Pdf ko'rish
bet18/19
Sana27.07.2021
Hajmi4,9 Mb.
#130278
1   ...   11   12   13   14   15   16   17   18   19
Bog'liq
mis603-dec2007

 

 

 



5.1.3.As it is written in the report on the Management Plan presented by Uzbekistan 

authorities (report on “Management-Plan of the Conservation and Rehabilitation of the 




Historical Centre of Samarkand”, Samarkand, 2006, p.11), it is planned to regenerate former 

city walls (Annex 3 Photo from Magazine 3-2007, p.52) and the gate (Annex 3 Photo from 

Magazine 3-2007, p.51) of the Timurid part of Samarkand in order for them to be used –as it 

is written in the report- as facilities for handicrafts workshops and centres for tourism 



services. At whole, the reconstruction of walls and gate enables for revival of former 

corresponding artistic image of Old city (report, p.11). This large-scale reconstruction project 

would be very harmful to the general view of this part of the Timurid town, and does not 

conform to international conservation/preservation principles. A hotel, which it is planned to 

construct next to the remains of the Timurid city walls, will also cause significant damage to 

this very special historic area.  

 

The mission recommends a halt to new constructions with “historic façades” and the total 



reconstruction of the city walls. Instead it is recommended that all new buildings of poor 

quality and harmful functions should be demolished and the historic remains consolidated 

and presented with archeological excavations where essential. .  

 

5.2  Recommendations related to the Management Plan: 

The final detailed Management Plan, which will take into account the recommendations of 

the WH Committee, is in process of development.  As stated in the draft Management Plan

research, development of normative documents and organizational activities will be finished 

during the first stage of realization of the draft Management Plan (2007- 2010).  

 

 

5.2.1. A Conservation Strategy for the whole property, including the monuments and 



residential areas of the historic city, should be prepared, adopted and implemented and be 

based on a proper documentation of the property.  A scientific monitoring system, as a part 

of the Conservation Strategy, should be put in place to collect and analyze data in order to 

evaluate different factors affecting the monuments: environmental and human factorsimpact 

of the restoration works, effectiveness of ongoing conservation, etc.. 

 

A conservation strategy for the existing residential districts which have been neglected until 



now, should be developed as soon as possible, in order to facilitate their rehabilitation based 

on accurate recording and restoration rather than rebuilding. Any further demolition of the 

traditional housing areas should be prevented pending the adoption of the necessary 

conservation strategy and management plan. All possible measures should be taken in order 

to encourage their sustainable development and rehabilitation. 

 

As seen during the mission, several areas surrounding major monuments such as Registan 



Ensemble, Bibi Khanum, Gur Emir have suffered significant losses. Some traditional urban 

fabric is still intact (as noticed in the surroundings of Aksaray Mausoleum). Their future 

protection and rehabilitation as key parts of the historic values of the town should be given 

high priority.  

.

 

5.2.2. A coherent urban conservation and planning policy should be developed as part of the 



Management Plan of the World Heritage area and its buffer zone. It should be integrated into 

the Urban Development Plan. 

 

                                       



   

5.3  Establishment of a Committee: 

It is necessary to strengthen The Scientific Board on Protection and Utilization of Monuments 



in Samarkand, perhaps by including some international experts, for consultations and taking 

scientific decisions in conformity with international principles related to the restoration and 

documentation of historic properties, as well as the rehabilitation of the historic quarters and 

approaches to developmental projects. 




 

5.4 Strengthening of the site management. 

 

Taking into account the scope and complexity of issues facing the property, the site 



management system should be strengthened. There is also a need to improve coordination 

between all the different institutions in order to be able to execute the work plans developed 

under the Management Plan, such as on-going maintenance, major restoration projects, 

monitoring, documentation, promotional activities and tourism. 

 

 


Download 4,9 Mb.

Do'stlaringiz bilan baham:
1   ...   11   12   13   14   15   16   17   18   19




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish