Краткое содержание отчета по экологической оценке Проекта по уст ойчивом у управлению т верды м и от ходами



Download 3,95 Mb.
Pdf ko'rish
bet65/93
Sana06.07.2022
Hajmi3,95 Mb.
#743586
TuriКраткое содержание
1   ...   61   62   63   64   65   66   67   68   ...   93
Bog'liq
по экологической оценке Проекта по устойчивому управлению твердыми отходами

Sanitarian-Protection Zone
295. 
The location of all service centers was selected in accordance with several conditions: 
environmental, resettlement and technological. National legislation16 identifies activities on 
repairing of special techniques (trucks, bulldozer and etc.) as belonged to 3rd class of hazard 
(1 is highest and 5 is lowest). In case of implementation of advanced technologies 
(conduction maintenance works inside of the building with modern techniques) service 
centers are classified as class 4. For this class buffer zone is 100 meters. However, if 
maintenance works implemented in service center does not include tin-painting works, the 
buffer zone can be decreased up to twice - 50 m.
296. 
The extent of the buffer zone was discussed with the Republican Center of State 
Sanitarian Epidemiological Surveillance under the Ministry of Health. As per an official letter 
submitted to the Implementation Agency - State Committee on Ecology and Environment 
Protection #09-/5336 dated from August 21, 2019 (Attachment 1), service centers designed 
for the provision of the maintenance for trucks without welding and painting works, the buffer 
zone is defined as 50 meters. Therefore, all sites were selected with the condition to keep 50 
meters between the workshop area and the closest living houses. Moreover, during site 
selection, attention was paid to the presence of such sensitive receptors as schools, hospitals 
and historical places.
297. 
If during the detailed design stage, or implementation stage, the locations of service
16 Sanitarian Norms and Rules (SanR&N) 0350-17 “Protection of air in settlement area in Uzbekistan”, 2017
88


centers will change, the buffer zone requirements have to be reassessed. The following 
activities are proposing to mitigate impacts identified at the pre-construction stage.

Download 3,95 Mb.

Do'stlaringiz bilan baham:
1   ...   61   62   63   64   65   66   67   68   ...   93




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish