◾
Index
Network devices, 364–365, 365f
Network(s)
industrial, 15–16; see also Industrial networks,
of PLCs
monitoring, 70
PLC, 13
topology
bus topology, 359, 359f
defined, 357
ring topology, 358–359, 358f
star topology, 357–358, 358f
two different, motor operation with power supply
from, 94
Nomogram, for internal diameter calculation of
pressurized air distribution pipe, 162–163
Numerical switches, 205–206, 206f
O
Object painting and transporting system, 403–404,
404f
Object placement distance, 41
Object stamping machine, industrial automation of,
179–181
Octal arithmetic systems, 413–414, 414f
Odd parity, 416
OFF-Delay timer, 64, 66, 317
ON and OFF operation, 4, 5–6
ON-Delay timer, 64, 65, 66, 317–318, 317f
Open Systems Interconnection model (OSI), 363, 364
Operating frequency, proximity switches, 41
Operating system, PLC, 225–226
Operation(s)
control of power transformer, 108–109, 110f
fault indication and, 83–84
machine, see Machine operation
n machines with pause under specific conditions,
151–155
principle, relays, 25–27
pump
based on level control, 100
two pumps according to demand, 100–101
START/STOP, of motor, 122–124
states, 4, 5
three air compressors with predefined combinations,
112, 113f
of two pumps with cyclic alteration, based on low-
high demand, 109, 111
Optical level switches, 57
OR logic, 307, 307f
in combination with AND logic, 308, 308f
Oscillating circuit, 54
Output devices, 211
Output Image Table, PLC, 195
Output impedance adjustment, PLC installation and,
257–258
Overload relay tripped, 39
P
Packaging system, of balls, 383–384, 383f
Paddle-type liquid flow switches, 57, 58f
Palindromic movement, of worktable with memory,
148–150
Papermaking process, stages, 1, 2f
Parity checking, hexadecimal arithmetic systems,
416–417
Parking fullness check, PLC programming in, 332–333,
333f
Peak pump, defined, 111
Periodic operation of machine, with two time
constants, 88
Personal computers (PCs), 193
PLC vs., 193, 195
structure, 193–194, 194f
Photocells, see Photoelectric switches
Photo-coupled solid-state relay, 33f
Photoelectric switches, 47–50, 205
dark-on and light-on operation of, 49, 50t
defined, 47
for detection of humans, 101–102
diffuse-reflective, 49
exterior view, 47f
retro-reflective, 48–49
through-beam, 47–48
types, 47
PID algorithm, 376
PID control
current error, 374
described, 373–376, 374f
design, 373–374, 374f
in industry, 373–379
operation, 375
in PLCs, 376–379, 377f–379f
combination with interrelated sub-processes, 377,
378f
independent and separate module, 377, 378f
PID algorithm, 376
PID FB controller, 376–377, 377f, 379
sequential control, 377, 378f
sequential execution, 377, 379, 379f
set point, 373, 374f
theoretical aspects, 373
tuning technique, 375–376
Ziegler-Nichols method, 376
PID FB controller, 376–377, 377f, 379
Piston based compressors, 161
Piston’s translation, speed of, 167
Piston stroke, length of, 167
Plastic balls, color-based separation of, 399, 401f
Plastic membrane wrapping, roller conveyor system for,
399, 400f
Platinum, in RTD manufacturing, 61
PLCs, see Programmable logic controllers (PLCs)
Pneumatic actuation of valve, 174
Do'stlaringiz bilan baham: |