Specimen answers to NEBOSH examinations
437
Observations 
Priority/risk 
Actions to be taken (if any) 
Time scale
List hazards, unsafe practices and
 
(H, M, L)
 
List all immediate 
and
longer-term
 
(immediate,
good practices 
actions required 
1 week, etc)
GENERAL OBSERVATIONS (Cont)
6.
Risk of slips, trips and falls due to trailing

Fix covers over cables and 
Immediate
cables in both workshops. (Electricity Regs.) 
re-route away from busy walkways.
Reorganise workshop layout and/or work
1 week
activities to reduce risk of tripping.
Install additional power sockets to reduce the
6 months
need for long trailing cables.
7.
Timber left lying on fl oor of both

Stack all unused timber in corner of 
Immediate
workshops – slip hazard. 
workshop or adjacent free room.
Fix up suitable shelving to store timber
2 weeks
safely. Only store a day’s requirement in 
the workshops. Include this arrangement 
in future training and monitor.
Decide on a future strategy for timber
6 months
storage and implement.
8.
Risk of back injuries from lifting heavy

Ensure that timber lengths are always 
Immediate
lengths of timber and manufactured window
lifted by at least 2 persons and window
frames. (Manual Handling Regs.) 
frames by 4 persons.
Undertake a manual handling risk assessment
2 weeks
to see whether mechanical assistance 
can be used.
Give everyone a basic manual handling
1 month
training course including supervisors.
Monitor activities regularly. 
Every 3 
months
9.
First aid box is fully and properly stocked and

No action required other than monitoring 
Each week.
appropriate notices displayed in each workshop.
the contents of the fi rst aid box to ensure
(First Aid Regs.) 
that it is refi lled.
10.
No trained fi rst aider in the building. If required,

Arrange for at least 1 member of staff 
3 months
help is obtained from next building. 
(preferably 2) to be trained as a fi rst aider.

Download 5,86 Mb.

Do'stlaringiz bilan baham:
1   ...   708   709   710   711   712   713   714   715   ...   722




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish