Causes and prevention of fi re
161
The client can then judge the response from the contrac-
tor to make the fi nal selection and award of the contract. 
The considerations during the fi nal selection process will 
be based on the information provided by the contractor 
which should include, as necessary:

Safety plan for the project

Risk assessments for the project works

Method statements for the project works

Response to the issues raised by the client

Evidence of the resources to be allocated to the 
project, such as:

Plant and equipment

Access 
procedures/equipment

Materials

Safety 
equipment

Numbers and skills of personnel and 
subcontractors

Employment 
procedures

Emergency equipment and procedures

Time allocated for completion of the works

Nominated project management personnel, includ-
ing health and safety responsibility

Procedures for checking the competence of 
subcontractors

Defi ned safe systems of work

Permit to work systems

Specifi c emergency procedures.
8.4.11 Managing the contract
Once the contract has been awarded and the work com-
mences, the client will still need to exercise adequate 
control over the project works to ensure the contractor 
does, in fact, maintain the health and safety standards 
required.
In order to do this the client would need to establish 
joint management procedures with the contractor. The 
nature and degree of control required must be kept in 
proportion to the size and complexity of the project, and 
will depend on the extent of risk involved in the work 
and the nature of the work site.
The management procedures should be determined 
at the planning stage of the project and form part of the 
conditions of the contract.
The areas that will need consideration will include:

Management of the project:

Contractors 
procedures

Client 
procedures

Joint 
procedures.

Project monitoring procedures for the contractor 
and client are held jointly and require agreed proto-
cols for:

Communication and reporting procedures

Procedures for dealing with non-compliance 
issues

Suitable welfare arrangements

Emergency procedures for fi re, medical and 
other emergency.

Download 8,94 Mb.

Do'stlaringiz bilan baham:
1   ...   239   240   241   242   243   244   245   246   ...   596




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish