Geothermal handbook: PlanninG and Financing power Generation t e c h n I c a L r e p o r t 2 / 2


develoPmeNt PhaSeS oF a Geothermal PoWer ProJeCt



Download 5,56 Mb.
Pdf ko'rish
bet78/177
Sana08.02.2022
Hajmi5,56 Mb.
#435170
1   ...   74   75   76   77   78   79   80   81   ...   177
Bog'liq
FINAL Geothermal Handbook TR002-12 Reduced

develoPmeNt PhaSeS oF a Geothermal PoWer ProJeCt
Geothermal projects have seven key development phases before the actual operation and 
maintenance (O&M) phase commences. According to the schedule in Figure 2.1, it takes 
approximately seven years to develop a typical full size geothermal project with, for example, a 50 MW 
turbine as a first step. However, the project development time may vary, depending on the relevant 
country’s geological conditions, information available about the resource, institutional and regulatory 
climate, access to suitable financing, and other factors. 


51
C h a p t e r 2
Each phase of geothermal project development consists of several tasks. After each milestone, 
the developer—either a project company or a country’s institution—will have to decide whether to 
continue developing the project or not. The first three phases, or milestones, take the developer 
from early reconnaissance steps to field exploration to test drillings. This first part of the project 
development (which could be broadly called the exploration stage) either confirms the existence of 
a geothermal reservoir suitable for power generation or not; it is usually seen as the riskiest part of 
project development. If the result from the first three phases, including the test drillings, is positive 
and the geothermal potential is confirmed, Phase 4 is initiated with the actual design of the power 
project, including the feasibility study, engineering of components, and financial closure. Phases 5 to 7 
comprise the development of the project itself, consisting of the drilling of geothermal production wells, 
construction of pipelines, construction of the power plant, and connection of the power plant to the 
grid. Figure 2.1 presents the project phases graphically.

Download 5,56 Mb.

Do'stlaringiz bilan baham:
1   ...   74   75   76   77   78   79   80   81   ...   177




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish