G e o t h e r m a l H a n d b o o k : P l a n n i n g a n d F i n a n c i n g P o w e r G e n e r a t i o n
viii
Acre
4,050 square meters
ADB
Asian Development Bank
AFD
French Development Agency
AfDB
African Development Bank
ARGeo
African Rift Geothermal Development Program
bbl
Barrel (oil)
BOO
Build, own, and operate
BOT
Build, operate, and transfer
BTU
British thermal unit = 0.29 Watt-hour
C Celsius
Capex
Capital expenditure
CDM
Clean Development Mechanism (of the UNFCCC)
CEG
Comision de Energia Geotermica
CER
Certified emission reductions
CFE
Federal Commission for Energy (Mexico)
CIF
Climate Investment Funds
cm
Centimeters
CO
2
Carbon dioxide
CPA
CDM project activity
CSP
Concentrated solar power
CTF
Clean Technology Fund
DBFO
Design, build, finance, and operate
EA
Environmental assessment
EBIT
Earnings before interest and taxes
EBITDA
Earnings before interest, taxes, and depreciation /amortization
ECA
Europe and Central Asia (WB region)
EDC
Energy Development Corporation (Philippines)
EGS
Enhanced (engineered) geothermal system
EIA
Environmental impact assessment
EMP
Environmental management plan
EPC
Engineering, procurement, and construction
ESMAP
Energy Sector Management Assistance Program
F/S
Feasibility study
FCFE
Free cash flow to equity
FCFF
Free cash flow to the firm
FCFP
Free cash flow to the project
FI
Financial intermediary
FIT
Feed-in tariff
FO
Fuel oil
g Gram
GDC
Geothermal Development Company (Kenya)
GEF
Global Environment Facility
GHG
Greenhouse gas
GJ Gigajoule
GoK
Government of Kenya
GRI
Geothermal risk insurance
GW
(GWe) Gigawatt (electric) =1 million kW
GWh
Gigawatt-hour
GWh/a
Gigawatt-hours per annum (year)
GWPI
Geothermal well productivity insurance
H
2
S
Hydrogen sulfide
HDR
Hot dry rock (also called EGS)
HFO
Heavy fuel oil
IAEA
International Atomic Energy Agency
IEA
International Energy Agency
IFC
International Finance Corporation
IFI
International financial institution
IP
Investment plan
IPP
Independent power producer
IRR
Internal rate of return
ISOR
Iceland GeoSurvey (Iceland-based geothermal consulting company)
ITH
Income tax holiday
KenGen
Kenya Electricity Generating Company
KfW
Kreditanstalt fur Wiederaufbau (development banking group of Germany)
kg Kilogram
km Kilometer
kW (kWe) Kilowatt (electric) = 1,000 Watt
kWh
Kilowatt-hour
L Liter
LCOE
Levelized cost of energy
LDC
Load duration curve
LNG
Liquefied natural gas
m Meter
m a s l
Meters above sea level
MBTU
1 million BTUs
MDB
Multilateral development bank
Do'stlaringiz bilan baham: