Investment Cost Estimates
Table 1.6 presents an indicative cost analysis for development of a typical 50 MW greenfield project
in a geothermal field with drillings of around 2 km in depth. Power plants of up to 50 MW can often
constitute a suitable first step unit, which can be expanded or multiplied at a later stage, or remain as
the final unit. Industry practice for well depths is usually between 1.5 and 3 km, with an international
average of around 2 km which will be used for the following calculations. The cost figures include
all exploration and drilling costs, as well as estimated financing costs for the development of a
hydrothermal reservoir for power generation.