1 | Portfolio exploration
, in which the country to some extent explores and evaluates multiple
geothermal fields, thereby increasing the probability of finding at least one viable site and
reducing the chance of overlooking significant development opportunities;
 
2 | Parallel development
of the fields selected from the portfolio to reduce time and costs, and
 
3 | Stepwise expansion
, reducing the risk of reservoir depletion and pressure drops by
developing a geothermal power project in cautiously sized increments/steps, determined by
reservoir data. 
Geothermal exploration in its initial phases—i.e., surface exploration to identify potential geothermal 
opportunities—should include all or most of the identifiable geothermal reservoirs in the country/
region. This principle is most obviously applicable to all the project development phases prior to 
drilling, and may well be applicable to the test drilling phase. The inclusion of test drillings will require 
a commitment of a substantial amount of resources, particularly when the commitment is to undertake 
drillings in several locations in parallel. Therefore, the selection of fields to drill should always be 
informed—and generally narrowed down—by the results of surface exploration.
Unlike the oil and gas industry that serves the global market, demand for geothermal power is limited 
by a specific country’s/region’s minimum system demand (base load). This means that the entire 
demand for geothermal power may be met by a relatively small number of productive fields. 
56
The assumption of a flat (constant) tariff for the entire operating period of the plant is made for the sake of illustrative simplicity. In the actual 
practice of projects with a long economic life, such as geothermal or hydropower, the initial tariff is often reduced over time. The repayment of 
loans, in particular, allows reducing the tariff over time and still maintaining a sufficient cash flow to generate adequate return to investors.


108
G e o t h e r m a l H a n d b o o k : P l a n n i n g a n d F i n a n c i n g P o w e r G e n e r a t i o n 
108
After the initial effort to consider as many reservoirs as possible, progress in geothermal exploration 
may enable better targeting of the relatively small number of the most productive or promising areas. 
Indeed, there are some examples from the World Bank practice of how the initial drilling results can 
inform decisions to redirect the resources of the next phase of the project to the most promising fields 
(Box 3.10).

Download 5,56 Mb.

Do'stlaringiz bilan baham:
1   ...   148   149   150   151   152   153   154   155   ...   177




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish