Geothermal handbook: PlanninG and Financing power Generation t e c h n I c a L r e p o r t 2 / 2


Examples of Successful geothermal PPP Implementation



Download 5,56 Mb.
Pdf ko'rish
bet131/177
Sana08.02.2022
Hajmi5,56 Mb.
#435170
1   ...   127   128   129   130   131   132   133   134   ...   177
Bog'liq
FINAL Geothermal Handbook TR002-12 Reduced

Examples of Successful geothermal PPP Implementation
Off-Take Contracts 
Guaranteed by 
State
National Geothermal
Development Company


93
C h a p t e r 3
the Philippine bot 
model. The Philippines is notable for its successful application of one particular 
form of PPP—that based on BOT contracts with private investors in geothermal power.
Indeed, BOT contracts are the main form of PPP that has contributed to the development and 
commissioning of more than 700 MW of geothermal power generation capacity. This has contributed 
substantially to bringing the Philippines into the second place (after the United States) in terms of 
installed geothermal capacity.
The first application of BOT-based geothermal PPP in the Philippines is attributed to the World-
Bank supported Leyte-Cebu Geothermal Power Project, where the construction of about 200 MW of 
geothermal power plants was to be implemented by a private firm through a BOT contract with PNOC 
EDC, the publicly owned national geothermal development company. For this component, PNOC EDC 
followed the BOT model which has come to be regarded as a typical private sector participation format 
(Figure 3.5). 
Under this BOT format, PNOC EDC performs the exploration and development of the geothermal field. 
For its part, the power plant contractor designs, supplies, installs and commissions the plant for a 
pre-determined cooperation period of 10 years. During the cooperation period, PNOC EDC pays for 
the plant through an energy conversion tariff (essentially a BOT fee) which covers operating costs, and 
provides for capital recovery and return on capital. Plant ownership is transferred and handed over 
to PNOC EDC at the end of the cooperation period. Finding commercial funding for the private BOT 
contractors was not a problem because the exploration (geothermal resource) risk and the off-take 
risk were clearly borne by the state through PNOC EDC and National Power Corporation (NPC), the 
national power utility. Furthermore, payments to the BOT contractor were backed by a government 
undertaking in case of default by PNOC EDC or NPC (Dolor 2006). 

Download 5,56 Mb.

Do'stlaringiz bilan baham:
1   ...   127   128   129   130   131   132   133   134   ...   177




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish