General Specification Electrical Function gmw3110 General Motors Local Area Network Enhanced Diagnostic Test Mode Specification



Download 8,35 Mb.
Pdf ko'rish
bet132/406
Sana03.04.2022
Hajmi8,35 Mb.
#525939
1   ...   128   129   130   131   132   133   134   135   ...   406
Bog'liq
gmw3110

8.5.7 Node Verification Procedure. 
Procedure 1: 
1. While not in programming mode, transmit a $20 service request with extra information appended to the 
message resulting in an incorrect length and verify negative response ($7F $20 $12). 
2. Repeat step 1 while programming mode is active and verify that the negative response ($7F $20 $12).is 
sent. 
Procedure 2: 
1. While in programming mode, transmit a service $20 request message using the functional all-nodes CAN 
Identifier ($101) + all-nodes extended address ($FE). Verify that there is no response sent. 
 
--``,,``````,``,,``,,,`,`,`,,-`-`,,`,,`,`,,`---
CameraLoops.com


GM WORLDWIDE ENGINEERING STANDARDS 
GMW3110 
© Copyright 2010 General Motors All Rights Reserved 
February 2010 
Page 105 of 336 
Procedure 3: 
1. While not in programming mode, transmit a service $20 request message while periodic DPIDs are 
scheduled. Verify the positive response and that the scheduled messages are halted. 
2. If the node supports dynamic DPIDs, define a dynamic message number via service $2C, and configure 
the node to schedule the message periodically via service $AA. Verify that periodic responses are 
received. Next transmit a service $20 request to the node and verify that the just-defined periodic 
message(s) are halted. 
3. Repeat the $AA request to schedule the dynamically defined message, and verify that the format of the 
dynamically defined message was not lost after the service $20 request. 
Procedure 4: 
(Valid if the send on change DTC logic is supported by the node).
 
1. While not in programming mode, transmit a service $20 request message while the DTC send-on-change 
algorithm is activated. Verify the positive response and that the updated DTC count information is no 
longer reported by the node. (This can be done by causing a code to transition to a state that satisfies the 
send-on-change DTC status mask, and verifying that no information is reported by the node.) 
Procedure 5: 
1. While not in programming mode, transmit a service $20 request message while tester-requested device 
controls are active. Verify the positive response and that full control of inputs/outputs is returned to the 
ECU. 
Procedure 6: 
(Valid if the SPS security access levels of the $27 service are supported). 
1. While not in programming mode, transmit a service $20 request message to a node whose security is 
currently unlocked via service $27 SecurityAccess (with Manufacturers Enable Counter set to $00 and 
vulnerability flag not $FF). After the $60 positive response, verify via a service $27 $01 request that the 
node becomes locked (seed != $0000). 
2. While not in programming mode, transmit a service $20 request to a node with a non-zero Manufacturers 
Enable Counter (MEC) and vulnerability flag not equal to $FF. After the $60 positive response, verify via a 
service $27 $01 request that the node unlocks (seed = $0000). 
3. While not in programming mode, transmit a service $20 request to a node with a Vulnerability Flag set to 
$FF (if applicable) and MEC set to $00. After the $60 positive response, verify via a service $27 $01 
request that the node unlocks (seed = $0000). 

Download 8,35 Mb.

Do'stlaringiz bilan baham:
1   ...   128   129   130   131   132   133   134   135   ...   406




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish